Not sure if this was posted or not, but there are rumors circulating that UO is having some problems with the lift hill mechanism for HRRR. A permit has been filed for deconstruction of the west end of Rockit. The other rumor is that because of the deconstruction, opening may have been pushed back to at least mid-summer.