I found these photos of the new Panama Canal locks. It's quite apparent that there is a good deal of work to be done.
One has to wonder if 2014 or even 2015 is a real possibility to be completed. In addition, how many of the big cruise vessels and the new duck tails so many other ships (including the Magic and Wonder) are required to be adding, will not be able to make a Canal passage in the next 2 years...or longer.
Now there are ways the requirement of the duck tail can be delayed or in the case of the Wonder and Magic they could still use the original locks under a special permit. However I don't think they are going to be finished in 2014 or maybe even 2015.
AKK
One has to wonder if 2014 or even 2015 is a real possibility to be completed. In addition, how many of the big cruise vessels and the new duck tails so many other ships (including the Magic and Wonder) are required to be adding, will not be able to make a Canal passage in the next 2 years...or longer.
Now there are ways the requirement of the duck tail can be delayed or in the case of the Wonder and Magic they could still use the original locks under a special permit. However I don't think they are going to be finished in 2014 or maybe even 2015.
AKK