Construction walls are up on the Resort Monorail's MK Station where guests normally exit the monorail. Instead, guests are apparently entering and exiting from the same walkway.
There are now cast members at the pen stations to ensure that the pens don't walk away.
The existing rock work for Ariel's Grotto seems to be completed. A large pole is sticking out from one of the structures in the old 20K area.
Riverboat is officially closed and a sign/CM was outside the station to inform guests.
Stitch's Great Escape has installed height signs and there was a CM stationed there each time I walked by. Good improvement from last Monday's experience.
Splash Mountain's Brer Frog projection in the queue is back. The Brer Rabbit projection inside the ride is still not working, but the two bunnies are talking about BR running up the hill. The Brer Rabbit AA that leaps up from behind the bushes is not working, but the Brer Frog animatronic following it is finally singing in sync with the score. The Brer Roadrunner is also talking again. However there is no speech from any of the characters (Brer Fox, Bear, or Rabbit) before the first dark drop. They seem to be fixing parts of the ride slowly to prevent a closure for a rehab.
Construction walls are up on the Resort Monorail's MK Station where guests normally exit the monorail. Instead, guests are apparently entering and exiting from the same walkway.
There are now cast members at the pen stations to ensure that the pens don't walk away.
The existing rock work for Ariel's Grotto seems to be completed. A large pole is sticking out from one of the structures in the old 20K area.
Riverboat is officially closed and a sign/CM was outside the station to inform guests.
Stitch's Great Escape has installed height signs and there was a CM stationed there each time I walked by. Good improvement from last Monday's experience.
Splash Mountain's Brer Frog projection in the queue is back. The Brer Rabbit projection inside the ride is still not working, but the two bunnies are talking about BR running up the hill. The Brer Rabbit AA that leaps up from behind the bushes is not working, but the Brer Frog animatronic following it is finally singing in sync with the score. The Brer Roadrunner is also talking again. However there is no speech from any of the characters (Brer Fox, Bear, or Rabbit) before the first dark drop. They seem to be fixing parts of the ride slowly to prevent a closure for a rehab.