Good. Except SF wouldn't even have swag.Festoon:
View attachment 321990
Swag:
View attachment 321991
(Unless you were referring to the word "mere".)
BLD2018-04837 Disney - East Entry Esplanade - Screening Tents - Demolition: 110 sq.ft existing built up kiosk and landscaping.
BLD2018-04599 Disneyland - SW - DL Frontierland Expansion - Bldg 10010 - Tenant Improvement:
The fact that SWGE is referred to as a Frontierland Expansion makes me so happy. Even more so, the Golden State Expansion from an earlier update, referring to a land that no longer exists!This was updated: Disneyland - SW - DL Frontierland Expansion - Bldg 10010 - Tenant Improvement: Show set Pre-fabricated Cargo Ship anchored to roof of existing facility.
BLD2018-05051 Disney - East Entry Esplanade / Security Check Point - Tenant Improvement: 4,800 sq.ft of pre-fabricated open air shade structure with electrical and metal fencing gate.
So I guess Disney has decided to build a more permanent structure for the eastern side for now. I wonder if that will change now that things last night went more favorably for them, EGW could be back on the table by next spring.
More permanent? It’s still a pre-fab structure. So it might just be a different configuration from what’s there now.
So I guess Disney has decided to build a more permanent structure for the eastern side for now. I wonder if that will change now that things last night went more favorably for them, EGW could be back on the table by next spring.
I doubt it, too many other issues for the city council to deal with. Maybe a year from now, if we are lucky. Also, Measure L is still in play.
Yes, add name...
BLD2018-04325 Disneyland - SW - DL Frontierland Expansion - Bldg 10040 - Tenant Improvement: Interior prefabricated show set (ADD NAME) being built offsite and will be bolted into place in the facility attraction #1
New roofing:
BLD2018-05237 Disney - Fantasyland / Sleeping Beauty Castle - Reroof: Tear off existing material, replace with fibre reinforced plastic located on existing turrets only.
BLD2018-05238 Disney - Fantasyland / Sleeping Beauty Castle -Reroof: 2,200 sq.ft Tear off existing material and replace with composition shingles located Sleeping beauty Castle and Holiday Shoppe Roof only.
Repairing the roofing finally. So after the holidays we'll be seeing a new roof installed. Yay!
Wow! It's taken them two years to budget this! That's insane. For those who don't remember, when they went to remove the diamond roof covers from the 60th Celebration to put up the snow roofs they found the temporary covers had damaged the real roof. Would that have been September 2016? After holiday, as a stop-gap they had to repair the diamond roof sections that had been damaged during removal (they weren't planned to ever be reinstalled) and put them back up.
Wow! It's taken them two years to budget this! That's insane. For those who don't remember, when they went to remove the diamond roof covers from the 60th Celebration to put up the snow roofs they found the temporary covers had damaged the real roof. Would that have been September 2016? After holiday, as a stop-gap they had to repair the diamond roof sections that had been damaged during removal (they weren't planned to ever be reinstalled) and put them back up.
And for some reason I vaguely remember a discussion about how Splash had a cost overrun during one of its recent refurbs. And that the budget to fix the castle went into that instead, so again it got kicked down the road.