Perhaps not... but the ToT at DCA looks like it will be finished very soon from the outside. How much is left to do on the inside. They are saying Summer 2004, but I think this attraction may be running ahead of schedule. Considering it is a copy ride, and that DCA really needs this attraction, maybe they are pushing to open earlier?
Any opinions, insight, or views on this?
Any opinions, insight, or views on this?