New Cast Parking Garage

mm121

Well-Known Member
Original Poster
just saw this construction on google, and was curious when it started and what if anything people know about it.

would be interesting to know what they plan to do with the space this will free up

universal 2.jpg
 

GLaDOS

Well-Known Member
It's been done for quite a while already. Nothing will be done with the rest of the parking lot other than being used for cast parking. Universal doesn't have enough as is, they're not going to sacrifice more.

Sorry it's not a more exciting answer. But thankfully Universal has plenty going on in other places.
 

mm121

Well-Known Member
Original Poster
It's been done for quite a while already. Nothing will be done with the rest of the parking lot other than being used for cast parking. Universal doesn't have enough as is, they're not going to sacrifice more.

Sorry it's not a more exciting answer. But thankfully Universal has plenty going on in other places.
how many stories is it?
 

maxairmike

Well-Known Member
4 floors, although they could have easily made it 5 if they would have graded out the ground level front to back at the parking lot level instead of leaving it sloped from lot to street level (and added like 5ft to its total height, or left it at 4 floors at a shorter total height). Extra cost for another floor and other talking points aside, it just drives me nuts seeing the thing left at its former grading instead of leveled to the lot.
 

Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.

Back
Top Bottom