Test track went down this morning and I am currently in the Orange line (50 minutes so far and almost noon, and still outside the show building. Judging from the extremely slow movement and counting heads that pass a single point of reference, only one simulator is being used for standby orange.
Since four simulators are available, I really think they are mismanaging the M:S resources by not balancing the load across all the simulators. Standby in this ride's early years never was this slow.
I really think that 3 sims should be set for Orange during today's circumstances. Anyone else with experiences that are similar??
Since four simulators are available, I really think they are mismanaging the M:S resources by not balancing the load across all the simulators. Standby in this ride's early years never was this slow.
I really think that 3 sims should be set for Orange during today's circumstances. Anyone else with experiences that are similar??