CaptainAmerica
Premium Member
It sounds like this may be a launch thing that could change?
That's GREAT news
It sounds like this may be a launch thing that could change?
Yes.
"More befitting" doesn't mean "better."
Absolutely. Not only does this mean booking your first LL at 7am may not be necessary, but it actually may be harmful in some cases, since you would be “wasting” one of your limited LL bookings for a time when lines are short anyway.No re-rides adds an interesting variable into touring with G+. The best move could be to wait before booking the next LL so it'd be during a more advantageous time slot. Park hopping's value is also increased where it might be better (for maximization of G+) to start in one park, run out of LL entitlements, then hop to another to finish out the day. At the same time, Epcot and MK might run out of LL passes in the afternoon as people hop over to them from AK and HS. Thus there's probably going to be an optimal hoping strategy if the goal is to ride, ride, ride.
Yep. FAA is a definite downgrade from Maelstrom, particularly the ice castle segment compared to the troll forest in Maelstrom. There are parts of FAA that are about as good, but that segment alone unfortunately makes it worse.It doesn't mean better, but more befitting takes on a lot more importance when the rides are of similar quality.
It's not like Frozen was a major upgrade over Maelstrom; it's a pretty bad ride.
Well, quite!Gotta leave enough Figment reservations for all!
It' not just Disney outsourcing their IT my nephew worked for Fedex in their IT dept he was pretty high up in the dept. Fedex started outsourcing their IT to India and wanted him to teach the systems to people that would replace him. Not in so many words he told them to pound salt and lef. Been with Fedex 15 yearsSo, you have to pay $3,000. plus your DVC charges???? Nuts.
Disney's IT started going downhill when they fired all their experienced IT workers and hired off site to cut costs. OH, that this was followed by the original team having to teach the new team too. I remember reading about this at the time, and thought, Oh No, there goes good IT at disney. We won't go back anymore and are happy to have had so many visits over the years.
What if HS rides are all "sold out" by then?Get to MK for open, rush Space Mtn (7DMT I can take or leave), burn through everything else as quickly as possible, then hop to DHS which has several great options on G+. No dining reservations that day.
This won’t be an every day thing for my family. “This is ride day.”
If crowds are moderate then you wont need to buy Genie+If crowds are moderate you should be able to ride 2 of them twice
Sure, I don't need to pay for any of this extra crap. If it saves me time (G+) or gets people out of my face (dessert party) then I likely will pay.If crowds are moderate then you wont need to buy Genie+
I hear you........But in Epcot or AK, to save 15 mins on 2 rides? I feel same way you do but most people wont....and you can pay for a dessert party separatelySure, I don't need to pay for any of this extra crap. If it saves me time (G+) or gets people out of my face (dessert party) then I likely will pay.
Nah, at those two I'd probably only utilize them if hopping. I'd be more likely to spend 10 bucks at Frozen and do the rest standby. But we'll see how this all plays out. They may find that without letting people pick whatever ride is available at the time, it flops.I hear you........But in Epcot or AK, to save 15 mins on 2 rides? I feel same way you do but most people wont....and you can pay for a dessert party separately
I think they should let you pick return time like FP+ was.............stagger the release of them if you have to but to limit me to have to take next available was the worst part of paper FP other than the runningNah, at those two I'd probably only utilize them if hopping. I'd be more likely to spend 10 bucks at Frozen and do the rest standby. But we'll see how this all plays out. They may find that without letting people pick whatever ride is available at the time, it flops.
It' not just Disney outsourcing their IT my nephew worked for Fedex in their IT dept he was pretty high up in the dept. Fedex started outsourcing their IT to India and wanted him to teach the systems to people that would replace him. Not in so many words he told them to pound salt and lef. Been with Fedex 15 years
I think they should let you pick return time like FP+ was.............stagger the release of them if you have to but to limit me to have to take next available was the worst part of paper FP other than the running
oh, there will most certainly be hoping involved with Genie+.No re-rides adds an interesting variable into touring with G+. The best move could be to wait before booking the next LL so it'd be during a more advantageous time slot. Park hopping's value is also increased where it might be better (for maximization of G+) to start in one park, run out of LL entitlements, then hop to another to finish out the day. At the same time, Epcot and MK might run out of LL passes in the afternoon as people hop over to them from AK and HS. Thus there's probably going to be an optimal hoping strategy if the goal is to ride, ride, ride.
I mean if Disney really was trying to get and keep employees seems like they would be a bit more employee focused/friendly.No. It's a labor shortage. That's why there's no parades and some restaurants and hotels aren't open.
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.