Huge FLE Update From DaMouse

Admiral01

Premium Member
I really don't know but I thought I read somewhere on these boards that the reason the 7D Mine train completion date is out so far is partially because of budget allocations for each year.....could be completely wrong - no need to slam me

So, they are funding it like an aircraft carrier...interesting :)
 

doctornick

Well-Known Member
Long time lurker and these pics look awesome. Had a question about the FLE -- the total size looks very large and I know all the plans that are set up for the immediate timeframe, but is there room for additional attractions in the future? When they first announced the mine train, I thought that the forest area would be ripe for additional rides near it (maybe one themed for Sleeping Beauty or Tangled) but the mine train looks so large that I'm not certain as much open space will exist.
 

The Duck

Well-Known Member
Long time lurker and these pics look awesome. Had a question about the FLE -- the total size looks very large and I know all the plans that are set up for the immediate timeframe, but is there room for additional attractions in the future? When they first announced the mine train, I thought that the forest area would be ripe for additional rides near it (maybe one themed for Sleeping Beauty or Tangled) but the mine train looks so large that I'm not certain as much open space will exist.

Hopefully one day but not any time soon.
 

The Duck

Well-Known Member
Just wondering about the mine train. I never cared for the name, "Seven Dwarfs Mine Train". Does anyone know if this is the permanent name or are we to expect something catchy like "Dopey's Mine Train Adventure" or "Dwarf Mountain"?
 

ShookieJones

We need time for things to happen.
Wow...these are some amazing pics.
I have to say I was never really that pumped about this project...(well
that's all relatively speaking of course)...ANYWAY...
This is getting me pretty psyched to see this in person.
 

bgraham34

Well-Known Member
I really don't know but I thought I read somewhere on these boards that the reason the 7D Mine train completion date is out so far is partially because of budget allocations for each year.....could be completely wrong - no need to slam me

Of what I heard I was $500 million but the coaster went above that so they are spreading out the costs another year. So I am not sure what the final budget was.
 

bdearl41

Well-Known Member
Great post by DaMouse. Really like the way all the greenery is shaping up. Walt alwasy said his favorite time in the park was at twighlight. I think that FLE will be amazing in twilight. I hope that most of the mountain for SWSDMT will be up by next summer, just to get a good scope of everything.
 

Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.

Back
Top Bottom