Nubs70
Well-Known Member
and he have better not eaten any of his pudding.Clearly, someone didn't eat all their meat.
and he have better not eaten any of his pudding.Clearly, someone didn't eat all their meat.
Clearly, someone didn't eat all their meat.
You gotta check the end lines ...on the.. rotary... gurter...That's quite a chunk of aluminum and polyplanking... seems like a lot of stress on the bearings under the pivot end.
Have to be able to run a riverboat through there. The fact they built a swing bridge bodes well for the future of the boat and the RoA area.Would that be a bridgeapasm?
Never really though of how big that canal is. Not until you compare it to a monorail.
Is that speculation or do you have information that points to the riverboat being moved through the canal? Possible fill in of parts of the RoA/Tom Sawyers Island?Have to be able to run a riverboat through there. The fact they built a swing bridge bodes well for the future of the boat and the RoA area.
The riverboat goes through the canal to get to a drydock north of the Contemporary Resort. It has been this way since the park was built.Is that speculation or do you have information that points to the riverboat being moved through the canal? Possible fill in of parts of the RoA/Tom Sawyers Island?
Is that speculation or do you have information that points to the riverboat being moved through the canal? Possible fill in of parts of the RoA/Tom Sawyers Island?
The riverboat goes through the canal to get to a drydock northnof the Contemporary Resort. It has been this way since the patk was built.
Not to burst your bubble, but this bridge is more or less for the Electrical Water Pageant that traverses the waterway twice a night. It just happens to also be convenient for the Riverboat the rare occasion is passes through the area.Have to be able to run a riverboat through there. The fact they built a swing bridge bodes well for the future of the boat and the RoA area.
Riverboat determines how large the opening needs to be. EWP has much smaller vessels. Same for the rail swing bridge.Not to burst your bubble, but this bridge is more or less for the Electrical Water Pageant that traverses the waterway twice a night. It just happens to also be convenient for the Riverboat the rare occasion is passes through the area.
Not to burst your bubble, but this bridge is more or less for the Electrical Water Pageant that traverses the waterway twice a night. It just happens to also be convenient for the Riverboat the rare occasion is passes through the area.
So, you're saying the next Disney sequel to The Jungle Cruise will be...Have to be able to run a riverboat through there. The fact they built a swing bridge bodes well for the future of the boat and the RoA area.
Or discontinued it all togetherIf it was only an issue of the water pageant, I think they would have found another location to store it instead of building the swing bridge.
this thing done yet?
This path will never be completed. It will continue to grow as long as there is imagination left in the world. It is something that will never be finished.
On top of the swing bridge.Um, Where's the moving sidewalk?
On top of the swing bridge.
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.