News Disneyland Resort Permits

SSG

Well-Known Member
Original Poster
Interesting

BLD2018-00997 Disney - Space Mountain, Backstage - Tenant Improvement: Construct new exit stairs at exterior back house area with new exit passageway leading to stairs. Starcade floor (previously escalator/speed ramp) to be infilled. Modifications to existing operations office to include new ceiling, drywall, electrical, mechanical, and exterior facade.
 

Disney Irish

Premium Member
Interesting

BLD2018-00997 Disney - Space Mountain, Backstage - Tenant Improvement: Construct new exit stairs at exterior back house area with new exit passageway leading to stairs. Starcade floor (previously escalator/speed ramp) to be infilled. Modifications to existing operations office to include new ceiling, drywall, electrical, mechanical, and exterior facade.

I guess that ends any idea of them bringing back the speed ramp.
 

MisterPenguin

President of Animal Kingdom
Premium Member
Interesting

BLD2018-00997 Disney - Space Mountain, Backstage - Tenant Improvement: Construct new exit stairs at exterior back house area with new exit passageway leading to stairs. Starcade floor (previously escalator/speed ramp) to be infilled. Modifications to existing operations office to include new ceiling, drywall, electrical, mechanical, and exterior facade.

Maybe fire marshal wanted an emergency exit that led outside more expeditiously?
 

SSG

Well-Known Member
Original Poster
BLD2018-01049 Disney - Mickey's Toontown / Gadgets Go Coaster - Berm Stairs - Tenant Improvement: Installation of new stairs located on existing berm.
 

SSG

Well-Known Member
Original Poster
I assume it's actually a Pixar Fest

SGN2018-00035 DCA - Main Entrance - Esplanade / Turnstiles - Temporary Sign Permit: installation of sign anchored to existing roof structure "Pixar Fes". (Install April 10th, removal Sept 15, 2018)

SGN2018-00036 Disney - Main Entrance - Esplanade / Turnstiles - Temporary Sign Permit: installation of sign anchored to existing roof structure "Pixar Fes". (Install April 10th, removal Sept 15, 2018)
 

Disney Irish

Premium Member
I assume it's actually a Pixar Fest

SGN2018-00035 DCA - Main Entrance - Esplanade / Turnstiles - Temporary Sign Permit: installation of sign anchored to existing roof structure "Pixar Fes". (Install April 10th, removal Sept 15, 2018)

SGN2018-00036 Disney - Main Entrance - Esplanade / Turnstiles - Temporary Sign Permit: installation of sign anchored to existing roof structure "Pixar Fes". (Install April 10th, removal Sept 15, 2018)

Ran out of room on the permit text box? Or is Anaheim Planning being cheap and not allowing more text....
 

SSG

Well-Known Member
Original Poster
I hadn't checked this for a couple of weeks but the status is now 'Issued.'

Permit Number: BLD2017-05054 Status: Issued Map Info: 1554 S DISNEYLAND DR
Description: DTD - Esplanade/West Plaza - Site Improvements underground utilities electrical 600 amp/120v subpanel, 150 kva transformer and a pour-in-place pad and water line for future building.

Name: MC DONALD'S CORP
Address: 1554 S DISNEYLAND
Received Date: 11/08/2017
Parcel: 08219026
Plan Check Date:
Issue Date: 03/01/2018
Expiration Date: 03/01/2019
Finaled Date:
 

SSG

Well-Known Member
Original Poster
BLD2018-01089 DCA - Paradise Pier Enhancements - Tenant Improvement: New (9) structural attachment points on existing roof to (building 504) to support sculptured figures. bldg Mania and 516 bldg Restroom - Tean
 

NobodyElse

Well-Known Member
I assume it's actually a Pixar Fest

SGN2018-00035 DCA - Main Entrance - Esplanade / Turnstiles - Temporary Sign Permit: installation of sign anchored to existing roof structure "Pixar Fes". (Install April 10th, removal Sept 15, 2018)

SGN2018-00036 Disney - Main Entrance - Esplanade / Turnstiles - Temporary Sign Permit: installation of sign anchored to existing roof structure "Pixar Fes". (Install April 10th, removal Sept 15, 2018)

I think it was just a one letter typo.

1521251010868.png
 
D

Deleted member 107043

Interesting

BLD2018-00997 Disney - Space Mountain, Backstage - Tenant Improvement: Construct new exit stairs at exterior back house area with new exit passageway leading to stairs. Starcade floor (previously escalator/speed ramp) to be infilled. Modifications to existing operations office to include new ceiling, drywall, electrical, mechanical, and exterior facade.

Is the Starcade still there? I thought it had been converted into a private event space for suckers people to rent.
 

SSG

Well-Known Member
Original Poster
Press event prep:

BLD2018-01106 Disney - Town Square - Tenant Improvement: Construct (1) temporary press riser (town square), (1) perfomance platform (center of esplanade), and (1) LED screen (Tomorrowland).

BLD2018-01107 Disney - Buena Vista - Tenant Improvement: Construct (1) temporary press riser.
 

SSG

Well-Known Member
Original Poster
BLD2018-01125 Disney - Cleo Parking Structure - Miscellaneous: 585 ln.ft. of private domestic water lines, 269 ln.ft. of private sewer lines, and 340 ln.ft. of private irrigation.
 
D

Deleted member 107043

Press event prep:

BLD2018-01106 Disney - Town Square - Tenant Improvement: Construct (1) temporary press riser (town square), (1) perfomance platform (center of esplanade), and (1) LED screen (Tomorrowland).

BLD2018-01107 Disney - Buena Vista - Tenant Improvement: Construct (1) temporary press riser.

Press event? For what I wonder.
 

Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.

Back
Top Bottom