• The new WDWMAGIC iOS app is here!
    Stay up to date with the latest Disney news, photos, and discussions right from your iPhone. The app is free to download and gives you quick access to news articles, forums, photo galleries, park hours, weather and Lightning Lane pricing. Learn More
  • Welcome to the WDWMAGIC.COM Forums!
    Please take a look around, and feel free to sign up and join the community.

News Disneyland Resort Permits

SSG

Well-Known Member
Original Poster
Hey, nice to know SOMETHING is being done that’s worth being called confidential.
The last confidential permit was installing a dressing room door......

classified top gun GIF
 

SSG

Well-Known Member
Original Poster
BLD2021-02262DLH - Frontier Tower - Electrical to support tenant improvement to remove and replace laundry conveyor track anchored to structure by installing (6) receptacles and relocating (3) lights. REF: BLD2021-01342
 

SSG

Well-Known Member
Original Poster
BLD2021-02324DCA - Monsters Inc - Mike and Sulley - Reroof: Overlay of existing 1 layer, 13,569 sq.ft flat roof


The former 'confidential' project now says:
BLD2021-02139DLR - West Tram Drop-Off - Temporary Structure: Install (1) truss structure anchored by concrete ballast blocks. (film premiere photo location) (05/28/21 thru 07/28/21)"

Cruella premiers May 28. Could be for that.
 
Last edited:

SSG

Well-Known Member
Original Poster
FYI, Bldg 6205 is the Mickey and Minnie ride.

BLD2021-02430Disney - Bldg 6205 - Tenant Improvement: Installation of LN2 system includes storage tanks, supply piping, mix room equipment and over head special affects delivery headers.
BLD2021-02488DCA - Hollywood Land - Temporary Structure: Install prefab showset arch anchored by concrete ballast blocks. (06-16-21 thru 06-15-22)
BLD2021-02416DLR - Central Maintenance Shop/BLDG 531 - Tenant Improvement: Remove wall mounted HVAC and replace with new ground mounted HVAC on new concrete pad.
BLD2021-02436DLH - Fantasy Tower - Electrical to support tenant improvement by changing out uninterrupted power system and panel.
BLD2021-02491DLH - Frontier Tower - Electrical to support change of use by installing receptacles and subpanels at fitness center. REF: BLD2021-01268
BLD2021-02492DLH - Central Energy Plant/ Boiler Room - Electrical to support tenant improvement by installing subpanel, disconnect, transformer and receptacles. REF: BLD2020-05585
 

SSG

Well-Known Member
Original Poster
More confidential stuff. Maybe replacing a paper towel dispenser this time?

BLD2021-02590DLR - Confidential Project ; see correspondence for scope
BLD2021-02613Disney - Bldg 3109 / Royal Courtyard - Electrical to support tenant improvement by installing (2) 20 amp circuit breakers for floor heater & circulating pumps, and (1) 60 amp circuit breaker for water boiler.
BLD2021-02612DLR - TDA - Electrical to support tenant improvement by replacing existing uninterrupted power system with new.
 