Will disney ever use Rocky Mountain construction as ride builder
Why would they? Disney designs its own rides so why would they hire RMC? Doing so would give Disney nothing and cost them a lot... Imagine they outsource their creativity on designing ride and what will happen next? Well imagine RMC comes up with a great idea, now RMC will just sell knock off's of that ride to Six Flags and every other park that wants it resulting in Disney having no greater value from a unique ride type.Will disney ever use Rocky Mountain construction as ride builder
Why would they? Disney designs its own rides so why would they hire RMC? Doing so would give Disney nothing and cost them a lot... Imagine they outsource their creativity on designing ride and what will happen next? Well imagine RMC comes up with a great idea, now RMC will just sell knock off's of that ride to Six Flags and every other park that wants it resulting in Disney having no greater value from a unique ride type.
Will disney ever use Rocky Mountain construction as ride builder
Which is why disney also dosen’t use b&mDisney uses sub-contractors just like everyone else, the main differences are:
1) equipment must be built to Disney specs, verified by design review and third party analysis
2) all plans and calculations become Disney property, so they can manufacture parts in house if they wanted
3) you must sign a non-disclosure agreement.
I spoke with a ride manufacturer representative once who admitted that when Disney calls for an quote they take the (insert name of of region theme park company) price and double it. Disney even wants to see documentation on where the steel for the rides is coming from.
I always thought it was because B&M coasters are so LOUD...Which is why disney also dosen’t use b&m
I always thought it was because B&M coasters are so LOUD...
Disney even wants to see documentation on where the steel for the rides is coming from.
RMC (Rocky Mountain Construction) makes the best track in the business. Alan Schilke who does the ride design for them is one of the best (if not the best) in the business. He is nothing short of brilliant. RMC really needs to work on the mechanics of their vehicle design. That is really the one area that is holding them back right now.
Agree 100%RMC (Rocky Mountain Construction) makes the best track in the business. Alan Schilke who does the ride design for them is one of the best (if not the best) in the business. He is nothing short of brilliant. RMC really needs to work on the mechanics of their vehicle design. That is really the one area that is holding them back right now.
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.