Search results

  1. I

    SOFT OPENING WATCH - Seven Dwarfs Mine Train Coaster

    Here now. Trains are running both empty and with some CM's on them. The empty trains are 40-45 sec apart, but then there is a 90 sec wait for the train with CM'S. Seems to be every 4th train has CM's.
  2. I

    SOFT OPENING WATCH - Seven Dwarfs Mine Train Coaster

    Sorry about that, I read back through and I found what I was talking about in post #369. They were simply adjusting the swaying action, not the track. I don't remember where I heard they were doing something with the track. Apologies.
  3. I

    SOFT OPENING WATCH - Seven Dwarfs Mine Train Coaster

    This is my first post but I have been sulking around the forums for awhile. We will be there starting next Friday. Could they be testing with weights again to see how the swinging action is with the modified track pieces?
Back
Top Bottom