It seems like the benefit to this is single-level load, dual level theaters (one screen below load, one above?
This seems like a cheaper soarin for future builds
Would have been a lot easier if that state listened to you several years ago and took more reasonable, measured steps at the time. Probably could have saved the taxpayers a lot of money
It seems like they could delay the stretching room narration 5 seconds and still keep the line fairly constant during peak times. The bottleneck on the load side of the stretching room frequently is still backed up when the next room opens.
I don't think it was understood how much but better it would be than the other beacons. Or that this was a permanent piece of the redesign of Epcot, not a 50th thing