CastAStone
5th gate? Just build a new resort Bob.
Look Mister President of Animal Kingdom YOUR the one who ripped out my childhood when you took out Prime-Evil Whirl!NOooo!! I remember that pedestal!! Disney is destroying my childhood!!!!
Look Mister President of Animal Kingdom YOUR the one who ripped out my childhood when you took out Prime-Evil Whirl!NOooo!! I remember that pedestal!! Disney is destroying my childhood!!!!
I believe the whole building was gutted when rainforest left. Didn't someone post pictures of even the bar stools sitting behind the building.At least they're not replacing the crude robotic animals and storm effects.
But I didn't get my selfie with it. Darn it! *snaps fingerSome people have asked if I post every permit coming out of the resort. I do not because some of them are completely uninteresting. For example, this permit today appears to be for swapping out a utility meter by the DTD parking lot.
BLD2021-00341 Electrical for a meter pedestal change out, same location. 1742 S DISNEYLAND DR WPS-21
Apologies to any Water-Power-Sewer fans.
Spoke to the Doc and he said that there are 14,000,605 places it could go, but only one will work.Another blind permit, but Building 751 is the Spidey attraction:
BLD2021-00440 Disney - see correspondence for scope 1515 S HARBOR BLVD 751
And this is a signage permit. It's using the general DCA address, so I'm not sure where it's going.
SGN2021-00008 Installation of (1) freestanding monitor display sign. 1515 S HARBOR BLVD
| BLD2021-00554 | Disney - Confidential project ; see correspondence for scope 777 W KATELLA AVE 420 (Golden Vine Winery) |
| BLD2021-00530 | Disney - Cleo Parking Structure - Electrical for new fixtures, circuits, conduit and conductors at floors 2 through 5. |
This was updated. Before: BLD2021-00440 Disney - see correspondence for scope 1515 S HARBOR BLVD 751
After: BLD2021-00440 DCA - BLDG 751 - Tenant Improvement: Install steel frame wall assembly attached to existing structure.
And added another confidential project at the Winery:
BLD2021-00554 Disney - Confidential project ; see correspondence for scope 777 W KATELLA AVE 420 (Golden Vine Winery)
And some parking work:
BLD2021-00530 Disney - Cleo Parking Structure - Electrical for new fixtures, circuits, conduit and conductors at floors 2 through 5.
| BLD2021-00613 | Electrical to support DCA - Cars Land - Site Work: Chain link fence enclosure for irrigation, located rear of radiator spring racer. REF BLD2020-04403 |
BLD2021-00613 Electrical to support DCA - Cars Land - Site Work: Chain link fence enclosure for irrigation, located rear of radiator spring racer. REF BLD2020-04403
| BLD2021-00410 | Disney Resort - BOH - Modular #20055 - New Commercial Construction: 1,280 office modular building and utility connections. REF:BLD2020-05573 |
| BLD2021-00417 | Disney Resort - BOH - Modular #20056 - New Commercial Construction: 320 sq.ft office modular building with electrical. REF:BLD2020-05573 |
| BLD2021-00433 | Disney Resort - BOH - Modular #20057 - New Commercial Construction: 640 sq.ft office modular building and electrical. REF:BLD2020-05573 |
| BLD2021-00801 | Disneyland - Jungle Cruise - Screen Wall: 12 ln ft x 12 ft high steel tube frame cladding and footings. 8 ln ft x 7 ft high fence. Add (2) additional feet to existing 28 ln ft retaining wall. |
| BLD2021-00804 | DLR - Maint BLDG 500 - Tenant Improvement: 2,500 sq ft to reconfigure existing 2nd floor Women's and Men's lockerrooms and restrooms. With mechanical, electrical and plumbing. |
| BLD2021-00805 | Disney - Confidential project ; see scope for correspondence |
BLD2021-00805 Disney - Confidential project ; see scope for correspondence
And added another confidential project at the Winery:
BLD2021-00554 Disney - Confidential project ; see correspondence for scope 777 W KATELLA AVE 420 (Golden Vine Winery)
| Description: | DCA - Golden Vine Winery - Food and Wine Festival - Temporary Structures: Install (12) food kiosks, (3) refrigerators and (7) shade trellis'. (Mar 4 - Jun 1 2021) |
BLD2021-00804 DLR - Maint BLDG 500 - Tenant Improvement: 2,500 sq ft to reconfigure existing 2nd floor Women's and Men's lockerrooms and restrooms. With mechanical, electrical and plumbing.
| BLD2021-00805 | Disney - Confidential project ; see scope for correspondence 1313 S HARBOR BLVD 2303 (Jungle Cruise) |
| BLD2021-01086 | DTD - BLDG G - Tenant Improvement: Construct new demising wall to separate units 103 and 104. Create new opening for door at rear of unit 104. Interior demolition to bring units to core and shell. With mechanical and electrical. |
| BLD2021-00978 | Disney - Gate 27 - Electrical for (1) 400 amp temporary power pole, (8) 100 amp subpanels, a 112kva transformer and (3) L650R receptacles. |
| BLD2021-01268 | DLH - Frontier Tower - Change of Use: Convert existing conference room into new fitness center. With electrical. |
Indoors? Very forward thinking. ;-)
BLD2021-01268 DLH - Frontier Tower - Change of Use: Convert existing conference room into new fitness center. With electrical.
| BLD2021-01342 | DLH - Frontier Tower - Tenant Improvement: Remove and replace laundry conveyor track anchored to structure. With plumbing and electrical. |
| BLD2021-01527 | DLH - Fantasy Tower - Tenant Improvement: Electrical to replace existing uninterrupted power system with equipment to be anchored to new concrete pad. |