DAK Tropical Americas Land Construction Thread

Gremlin Gus

Well-Known Member
Coming from the website that we cannot speak of, here are some updates on it! It does seem like the Encanto attraction showbuilding is very close, if not finished to getting all of the main steel structure completed with the walls going up sooner or later. Plus the carousel is getting it's concrete poured.

View attachment 911667

View attachment 911668

View attachment 911669


wdw-dak-tropical-americas-construction-03.12.2026-8398.jpg


wdw-dak-tropical-americas-construction-03.12.2026-8415.jpg



wdw-dak-tropical-americas-construction-03.12.2026-8445.jpg
 

eddie104

Well-Known Member
Pretty sure that's a no. The temple facade just sticks out farther into the plaza where the Aladar reflecting pool previously was, hence the new foundation and footings in front. The existing tiered structure will likely support the upper levels of the temple.
That makes sense and I did notice those footings starting to form.
 

etc98

Well-Known Member
Looks more to me like the apron surrounding it is removed and replaced with railing. The dome itself is still there.
If they do keep it, it’ll be interesting to see how they put a glass dome into an ancient temple.

Although I guess they could black it out so it’s still a dome, just not made out of glass
 