Star Tours at Disneyland has been closed for about a month now. Behind the construction walls they are in heavy demolition mode, ripping up flooring and erecting scaffolding throughout the queue, etc.
I figured it was time to get a construction thread going for this one. I'm sure we'll be seeing more work on the facade and marquee soon, as well as additional shots through cracks in the walls of the extensive work going on inside the building. And hopefully we can slot in some juicy rumors here when they inevitably show up from Al Lutz and other online sources over the next 8 months.
Maybe one of our resident photo wizards can link the recent construction shots from Miceage to this thread to get things started?
I figured it was time to get a construction thread going for this one. I'm sure we'll be seeing more work on the facade and marquee soon, as well as additional shots through cracks in the walls of the extensive work going on inside the building. And hopefully we can slot in some juicy rumors here when they inevitably show up from Al Lutz and other online sources over the next 8 months.
Maybe one of our resident photo wizards can link the recent construction shots from Miceage to this thread to get things started?
