Here are some new pics taken earlier today. I have also attached some pice from the Safari Trek for all that are interested.
The Mermaid building looks to be coming along great. HVAC on the roof and a secondary wall is up on the front and there is a small army of guys building another block wall today.
below is a Safari outpost near the Flamingo display
The outpost below is ouit on the main Savanna
Te next few pics show the platforms and cables for the Zip lines over the hippo pool.
Sorry I don't have much time to add any detail. Gotta be at Teppan Edo in 45 min. I just wanted to get the pics posted.
The Mermaid building looks to be coming along great. HVAC on the roof and a secondary wall is up on the front and there is a small army of guys building another block wall today.
below is a Safari outpost near the Flamingo display
The outpost below is ouit on the main Savanna
Te next few pics show the platforms and cables for the Zip lines over the hippo pool.
Sorry I don't have much time to add any detail. Gotta be at Teppan Edo in 45 min. I just wanted to get the pics posted.