I have a trip booked for 12/14 - 12/26.:xmas:
Am I right in thinking that I can call to make ADR's 180 days from 12/14?
Though I heard something about only being able to make 10 days reservations at this time even though i need 12 days?
If someone could confirm that would be great.
Thanks
Am I right in thinking that I can call to make ADR's 180 days from 12/14?
Though I heard something about only being able to make 10 days reservations at this time even though i need 12 days?
If someone could confirm that would be great.
Thanks