South Florida Water Management District Permit Application
10/13/25
Application Number: 251013-57961
Project Name: 407 Basin Stormwater Modifications 2
Project Summary: 407 Basin Stormwater Modifications 2 is the construction of conveyance system and a new dry detention pond (attenuation only) for discharge into the L-407 Canal.
The project is consistent with Conceptual Permit No. 48-00714-P, Application Nos. 100212-12 and 140801-15. Stormwater is treated prior to discharge to the Reedy Creek Improvement District Master System (RCID Master System) for attenuation.
Project Site:
View attachment 887592