Search results

  1. dstrawn9889

    Carousel of Progress exterior refurbishment

    and test track's vehicle pinstriping is reminiscent
  2. dstrawn9889

    Norway Pavilion Frozen construction - Frozen Ever After ride (Part 2)

    so some kind of structural support for beams on the floor above? there should be more than one though...
  3. dstrawn9889

    Norway Pavilion Frozen construction - Frozen Ever After ride (Part 2)

    well, as long as they aren't wooden snot balls with legs...
  4. dstrawn9889

    Changes to bus transportation for the water parks begins this weekend

    so bring a medical grade mask if you are that worried... just dont go spraying crap that sets off asthmatics
  5. dstrawn9889

    Norway Pavilion Frozen construction - Frozen Ever After ride (Part 2)

    i would say the arrow is a baseplate for a sign that will extend from the facade
  6. dstrawn9889

    "Show" keeps getting worse

    25 minutes spent printing the replacement posters is not going to interfere with any other upkeep. It would be a high crime if they did not store those high-res images for later replacement...
  7. dstrawn9889

    Changes to bus transportation for the water parks begins this weekend

    the Mark VI and the Innova 200 ARE THE SAME TRAIN BASE. they use the same beamway, since Las Vegas brought in the mark VI (since replaced by the Innova 200)
  8. dstrawn9889

    Changes to bus transportation for the water parks begins this weekend

    the quote you placed above is referencing the total amount of trains to be made to give them a competitive price. Bombardier just not interested in stamping out 12 trains, when they have orders for 60 and 70 at a time for metro transit companies.
  9. dstrawn9889

    Changes to bus transportation for the water parks begins this weekend

    the 'scale' you are referring to is the AMOUNT of trains, not the track gauge
  10. dstrawn9889

    Kilimanjaro Safaris After Dark - night safari

    i would assume there is a light(like in GMR) that lets the CM know when to proceed (clear track), there can also be one marking the proper path
  11. dstrawn9889

    Spaceship in Spaceship Earth

    between the inner and outer skins of the sphere... sweet
  12. dstrawn9889

    DHS Soundstage 1 Renovation - Toy Storia Mania expansion

    wow--- i would happily trade my anxiety of large groups and speaking to worry about how some bit of machinery 'could' fail... anyone want to trade?
  13. dstrawn9889

    Creepy New Survey Question....

    they switch the flip, locate us with the satellites, and cook us with Y-rays....
  14. dstrawn9889

    DHS Soundstage 1 Renovation - Toy Storia Mania expansion

    the lift hill DOES have a railing, it only deploys when an E-stop is initiated
  15. dstrawn9889

    TSMM now using StoryMaker

    the NFC on the bands should work close up... (my RF card access card works up to 5 inches from the pad) so if they ask you to put both hands on the gun to start with, it should be close enough for a read.
  16. dstrawn9889

    Star Wars Land announced for Disney's Hollywood Studios

    ugh, Skywalker colostrum, how did we get here???
  17. dstrawn9889

    Norway Pavilion Frozen construction - Frozen Ever After ride (Part 2)

    except Myrtle talking to you in the girls 2nd floor loo
  18. dstrawn9889

    Toy Story Land expansion announced for Disney's Hollywood Studios

    well if they were home safes, or the location intends to sell fireworks, a bank, or just a Jacuzzi dealer... that is what i mean by knowing what i likely to be in there... you would need higher strength concrete, a thicker pad, more rebar....
Back
Top Bottom