Luck's on our side too...September 12 thru 16; only one day effected
The walls in the TTA (among other areas) were put in to reduce the light leakage onto the ride track if i'm not mistaken.
I can confirm this is not happening.I may be the only one who is this hopeful but could the Space Mountain refurbishment later this year show the way for A Ghost Galaxy overlay? I mean space mountain wasn't refurbished that long ago and it is perfect timing for MNSSHP. And in my opinion MK seriously needs some holiday overlay on at least one of its rides
This sounds accurate.Which I guess is the whole point. Instead of closing the ride for 9 days in a row, they spilt it into thirds so that people have at least one day where's it's open when they're there (assuming they stay for 4 nights or more).
Must be frustrating for the crews working on it though to stop (twice) before they can finish.
My thoughts exactly. These are multi day maintenance downs. After these, hopefully the downs will turn into a single day per month and a single multi day per year with routine maintenance during the over night.Could this finally be a sign of routine maintenance? Is George K re-introducing a Disneyland standard long-lost at WDW?
Not frustrating. Proper maintenance planning will break the projects into the time allotted so each job will be completed in three days.Which I guess is the whole point. Instead of closing the ride for 9 days in a row, they spilt it into thirds so that people have at least one day where's it's open when they're there (assuming they stay for 4 nights or more).
Must be frustrating for the crews working on it though to stop (twice) before they can finish.
Could this finally be a sign of routine maintenance? Is George K re-introducing a Disneyland standard long-lost at WDW?