Pics on page 19 and 20.
MK
-I do have a pic of what could be the first piece of construction equipment in FL
Space Mountain area
-Skyway demo is complete
-Construction is beginning on the roof.
-Biggest news of all: Space Mountain refurbishment is bigger than what sources here have been saying! It won't be as noticeable to the average guest, but it is accomplishing what many of us wanted from the start and it's BIG (not on-ride audio, but bigger)!!!:sohappy::sohappy::sohappy:
There's a reason it's been taking so long for the refurbishment and why the TTA needed to be closed.
Epcot:
-Fountain railings are mostly complete
-SSE metal cut out added to the railings
-F&W is in full swing - heading there soon
-Soarin' got down to a 25 min wait this week!
-because of F&W and MNSSHP, EMH nights are all mixed up, Epcot's was on Wed weird.
-Near Test Track, there is a monorail beam that has been refurbished. It looks brand new and really sticks out. (I'll have pic later)
DHS:
-American Idol has moved its audition entrance to the left of Sounds Dangerous and is now more noticeable
-Luxo Jr is working and is pretty cool
-Backlot Tour will be going into rehab sometime in the future. The Catastrophe Canyon truck will be getting extra love during this rehab.
More to be added (along with pics) soon!
**** Updates as of 9:45 pm 9/24
-Living Seas will be getting natural lighting in the tanks to supply a needed dose of sunlight and Vitamin D to the fish
-There was one SSE cutout on the fountain railings yesterday, now there are three
-Food and Wine is already very busy
MK
-I do have a pic of what could be the first piece of construction equipment in FL
Space Mountain area
-Skyway demo is complete
-Construction is beginning on the roof.
-Biggest news of all: Space Mountain refurbishment is bigger than what sources here have been saying! It won't be as noticeable to the average guest, but it is accomplishing what many of us wanted from the start and it's BIG (not on-ride audio, but bigger)!!!:sohappy::sohappy::sohappy:
There's a reason it's been taking so long for the refurbishment and why the TTA needed to be closed.
Epcot:
-Fountain railings are mostly complete
-SSE metal cut out added to the railings
-F&W is in full swing - heading there soon
-Soarin' got down to a 25 min wait this week!
-because of F&W and MNSSHP, EMH nights are all mixed up, Epcot's was on Wed weird.
-Near Test Track, there is a monorail beam that has been refurbished. It looks brand new and really sticks out. (I'll have pic later)
DHS:
-American Idol has moved its audition entrance to the left of Sounds Dangerous and is now more noticeable
-Luxo Jr is working and is pretty cool
-Backlot Tour will be going into rehab sometime in the future. The Catastrophe Canyon truck will be getting extra love during this rehab.
More to be added (along with pics) soon!
**** Updates as of 9:45 pm 9/24
-Living Seas will be getting natural lighting in the tanks to supply a needed dose of sunlight and Vitamin D to the fish
-There was one SSE cutout on the fountain railings yesterday, now there are three
-Food and Wine is already very busy