Pop Century Resort - Remodeled Rooms

JTT

Well-Known Member
Original Poster
Does anyone know the room numbers or location of the Pop Century Resort remodeled rooms?
 

nbdysreal

Well-Known Member
We stayed 1 night on top floor of 90s and had a refurbed room. 5 rooms next to us didnt have door handles, then did the next morning so im assuming they were still doing that building as of last saturday.
 

allgiggles

Well-Known Member
Does anyone know the room numbers or location of the Pop Century Resort remodeled rooms?

Buildings 7, 8, 9, & 10 have been refurbished with 10 being the most recent (not sure if all rooms in that building have been released to inventory, but some of them definitely have). Building 6 was reported as being closed as of yesterday. It seems to be taking about 90 days to complete a building.
 

LIMA TIME

Well-Known Member
Was there in late sept, 80's and 90's were done when we were there. We got a refurbished room, not sure what the rooms were like before hand as having never stayed there, but they were really cool. Small, but really cool. We were on the top floor of the 80's building.

The 70's looked to be almost completed.
 

allgiggles

Well-Known Member
Was there in late sept, 80's and 90's were done when we were there. We got a refurbished room, not sure what the rooms were like before hand as having never stayed there, but they were really cool. Small, but really cool. We were on the top floor of the 80's building.

The 70's looked to be almost completed.

They're still very much working on the 70's. They just started releasing rooms in one wing in building 10 this week but most of the building is still under construction. They also just started closing rooms in Building 6 this week, though some rooms are still in use. It will most likely be another week or 2 until all of building 10 is open and early 2018 (Jan/Feb) until Building 6 is open. <sigh> It feels like they're working at a snail's pace.... I don't think there is anyway these refurbishments will be completed by the end of April 2018 as was indicated in the permits. When they finish with Building 6 (in about 90 days), they'll be half way....and construction started on March 6, 2017...so 10 months for the first half of the resort.
 

Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.

Back
Top Bottom