holy smokes! amazing! that is a crazy amount of progress in a short time
I do not suppose that we can really know, but it just feels to me like they're really kicked this into gear, perhaps accelerating the opening time? With no knowledge of the true schedule (or construction, for that matter), just a gut feeling I get when I'm seeing this stuff happen so fast.
Oh, well. Time will tell.
Maybe they need to get done bulldozing so they can drive that equipment on over to AK or something . . .
I have said it for awhile now but I really believe it has to do with Legoland.
yeah the arched tunnel is the bridge to belle's village you can see it cleary in the high res art
Edit: Beat me to it. Took me too long to cut that little bit of plan!:lol:
Yes, most of the track is outside.Any idea on how big the show building for this is going to be? It seems like the majority of the ride is outside.
Percentage wise....I'd say it's pretty close.I'd love to have a comparisson with Big Thunder regarding how much of the ride is inside and how much is outside
in the concept art it looks like it goes inside 5 times.. has this changed?
Definately not 5 times.
Station is indoors.
Lift A/first mine scene is indoors.
Second mine/Lift B is indoors.
That looks to be it, based on the layout I have.
Definately not 5 times.
Station is indoors.
Lift A/first mine scene is indoors.
Second mine/Lift B is indoors.
That looks to be it, based on the layout I have.
I thought the model at the D23 showed one of the lifts outside? Am I mistaken?
Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.