PERMITS

Darkbeer1

Well-Known Member
BLD2019-03586 Darkbeer's House - Photovoltaic System: Install residential roof-mounted solar system with (1) inverter, (14) modules, 100 amp load center, transfer switch and backup battery. (Tie into existing system REF BLD2015-00222)

FINAL!!!!

One more project done. (Well, need to have a shed built to cover the Battery)

Edited to add - Let me state I got a great Building Inspector, which is par for Anaheim. All the projects I have been involved in, the project manager always says the inspectors are tough and picky, which is a good thing.

Now back to Disneyland's permits...
 
Last edited:

SSG

Well-Known Member
Original Poster
BLD2019-04383Electrical for Disney - North Service Area / Roundhouse - Bldg 9058 change of use. REF BLD2019-03207
BLD2019-04384Electrical for Disneyland - Story Book Breakroom / BOH tenant improvement. REF BLD2019-03843
BLD2019-04385Electrical for GCH - Hearthstone Lounge / Suite 100 tenant improvement. REF BLD2019-03030
BLD2019-04386Electrical for DTD - World of Disney/BLDG J tenant improvement. REF BLD2019-03965
SGN2019-00209Disney - KCML Parking Lot - Intall (1) new freestanding pylon sign with attached illuminated signs.
 

SSG

Well-Known Member
Original Poster
BLD2019-04514DTD - Rainforest Cafe / Trailer - Asian Street Eats - Tenant Imrovement: New cooking and food service trailer sitting on jacks anchored to the ground. Electrical to power 150 amp subpanel. Plumbing for above ground grease interceptor and connect to existing cleanout.
BLD2019-04521(PLANCHECK ONLY) Disneyland - BOH - Tenant Improvement: Electrical to changeout (7) 12kv switchgear switches anchored onto existing concrete pads.
 

SSG

Well-Known Member
Original Poster
Weird:


ReceivedBLD2019-04583WALT DISNEY WORLD CO1545 S DISNEYLAND DR (BLDG CC)Disney - Due to confidentiality, scope will be added at issuance; see corresspondence for scope.


And the rest:


ReceivedBLD2019-04545WALT DISNEY WORLD CO1313 S HARBOR BLVD 9055 (Production Trailer)Disney - Building DL 9055 - Tenant Improvement: 120 sq.ft to construct interior wall to create room.
ReceivedBLD2019-04584WALT DISNEY WORLD CO1313 S HARBOR BLVD 1119 (Main Street)Disney - Main Street Train Station - Candlelight Procession Installation - Temporary Permit: Outdoor steel platforms, outdoor wheelchair lift, accessible platform, show light towers and audio towers, (2) generators, movable folding viewing seats and wheelchair spaces with companion seats. (11-24-2019 to 12-6-2019)
ReceivedBLD2019-04585WALT DISNEY WORLD CO1313 S HARBOR BLVD 1119 (Main Street)Disneyland - Main Street - Tenant Improvement: Install (10) ground-mounted lighting truss towers and (16) roof-mounted lighitng truss towers. (10-9-19 through 10-12-19)
ReceivedBLD2019-04587TAYLOR CENTERNO1570 S DISNEYLAND DR 102DTD - BLDG H / Jamba Juice - Tenant Imrovement: Reconfigure counter, install non-load bearing partitions, partial ceiling and new bulkhead above existing storefront. With mechanical, electrical and plumbing.
 
Last edited:

Darkbeer1

Well-Known Member
SSG, it is not weird, Disney has been working with the city to come to a balance of public notification requirements and protecting proprietary information.

If you look back, secure buildings are allowed the same thing, such as banks, jails, etc.
 

socalifornian

Well-Known Member
Weird:


ReceivedBLD2019-04583WALT DISNEY WORLD CO1545 S DISNEYLAND DR (BLDG CC)Disney - Due to confidentiality, scope will be added at issuance; see corresspondence for scope.


And the rest:


ReceivedBLD2019-04545WALT DISNEY WORLD CO1313 S HARBOR BLVD 9055 (Production Trailer)Disney - Building DL 9055 - Tenant Improvement: 120 sq.ft to construct interior wall to create room.
ReceivedBLD2019-04584WALT DISNEY WORLD CO1313 S HARBOR BLVD 1119 (Main Street)Disney - Main Street Train Station - Candlelight Procession Installation - Temporary Permit: Outdoor steel platforms, outdoor wheelchair lift, accessible platform, show light towers and audio towers, (2) generators, movable folding viewing seats and wheelchair spaces with companion seats. (11-24-2019 to 12-6-2019)
ReceivedBLD2019-04585WALT DISNEY WORLD CO1313 S HARBOR BLVD 1119 (Main Street)Disneyland - Main Street - Tenant Improvement: Install (10) ground-mounted lighting truss towers and (16) roof-mounted lighitng truss towers. (10-9-19 through 10-12-19)
ReceivedBLD2019-04587TAYLOR CENTERNO1570 S DISNEYLAND DR 102DTD - BLDG H / Jamba Juice - Tenant Imrovement: Reconfigure counter, install non-load bearing partitions, partial ceiling and new bulkhead above existing storefront. With mechanical, electrical and plumbing.
So candlelight should be November 30th and December 1st then
 