They're also gating and lighting the Carousel Inn lot, which butts up against Sybron :
BLD2019-01846 (NAME ??) - Carousel Parking Lot - Site Development: Install (12) light poles, (1) 100 amp panel and 164 ln ft x 7 ft high fence with swing gate.
And modifying Pumbaa:
BLD2019-01843 (NAME??) - Pumbaa Parking Lot - Site Development: Install (1) 47 sq ft prefabricated guard booth, (1) light pole, (2) motorized gate arms, (1) card reader, (1) 125 amp panel and 35 ln ft x 12 ft high chain link fence and swing gate
In addition to USCIS and Sybron.
I wonder if the plan is to punch a hole from the Carousel Inn lot through to Sybron/USCIS and have CMs access the resort that way.