Despite the name, this thread actually lists Notices of Commencement (NOCs) for construction projects around the WDW property. A NOC is a document that must be filed before work on a specific project can begin and is usually filed shortly before work starts. It's main purpose is to assure that contractors get paid on time once the work is complete. NOCs will sometimes have an explicit expiration date, but most of the time a date is not specified in which case they expire one year from the filing date.

The documents generally don't contain much information. They will list the location where the work is being done, for example the name of a ride or store. They also show a description of the work being done which is normally very vague, for example "Electrical" or "Construction". Some of the NOCs I post will just say "BVCC". This stands for Buena Vista Construction Company which is Disney's internal construction company. The work description on BVCC permits is almost always the very vague "Provide labor, material and/or electrical for construction".

Unlike previous years, I have stopped posting every permit since most do not contain any useful information. When I do find interesting permits I will post them here and will usually post them in the applicable thread.

Previous Years
2018
2017
2016
2015
2014
2013
2012
2011
 

danlb_2000

Premium Member
Original Poster
The post will contain permits from the South Florida Water Management District. These are filed whenever a project will effect storm water control in some way, for example creating new hard surfaces like building or roads where there were not hard surfaces before. These permits are not as common but are normally for larger project and contain much more detail them the NOCs.

191125-2375 - World Drive Phase 2 - Plans
191021-2094 - Walgreens #15023 @ Flamingo Crossings - Plans
191007-1987 - H-1 Site Development - Plans
190930-1918 - Fw Cast Parking - Plans
190211-8 - Magic Kingdom Bus Building And Shade Structure - Plans 1, Plans 2
190211-19 - Flamingo Crossings L L C - Plans 1, Plans 2, Plans 3
190211-15 - Flamingo Crossings Phase 1 Parcel H5 - Plans
190114-8 - Project 89 Ad Phase 1 (Reflections resort) - Plans, Eng Report
190225-5 - D A K Basin J Improvements - Plans, Eng Report
190225-12 - Stolport Construction Access Road - Plans, Eng Report
190429-4 - Magic Kingdom Hardscape Improvements - Plans, Eng Report
190429-9 - World Drive North Regional Stormwater Facility - Plans, Eng Report
190506-10 - Project 89 Ad Phase 2 (Reflections resort) - Plans 1,Plans 2, Eng Report 1, Eng Report 2
 
Last edited:

danlb_2000

Premium Member
Original Poster
1/2/2019 - Disney Springs - Grunau Company Inc, Grunau Company
-

1/3/2019 - Disney Hollywood Studio - Vision Three Sixty Llc
555 Stage Lane #B - General Construction

1/14/2019 - Disney Hollywood Studio - Icarus Exhibits Inc
394 Cypress Dr - Project D - Fabricate and install AD props

1/14/2019 - Disney Springs - Interamerica Stage
1496 E Buena Vista Dr (NBA Experience) - Project DS WS - Installation of Truss and Equipment

1/16/2019 - Epcot - Interamerica Stage
Project S - Installation of light sources - 1350 Avenue of the Stars (Guardians)

1/17/2019 - Saratoga Springs Resort - Beatty Balfour
1948 Broadway, Buidling G - Model Rooms

1/30/2019 - Disney Hollywood Studio - Pcl Construction Services Inc
980C1 Osceola Pkwy (Star Wars Hotel) - Site Trailer Package (#2)

1/31/2019 - Epcot - Cockram Scenario Inc
1830C Avenue of the Star (Rat) - Installation of show set

1/31/2019 - Magic Kingdom - Coastal Steel Inc
4970 N World Dr (Tron) - Install Ride Steel

2/1/2019 - Disney Hollywood Studio - Icarus Exhibits Inc
375 Cypress Dr (Galaxy's Edger) - Project D - Fabricate and install AD props

2/1/2019 - Reflections Resort - Balfour Beatty Construction
4500 Big Pine Road - New Building, Mechanical, Electrical, Plumbing, Fire Protection, Civil and Area Development

2/1/2019 - Reflections Resort - Balfour Beatty Construction
623 West Wildreness Way - Area Development of site

2/6/2019 - Disney Hollywood Studio - Candela Controls Inc
555 Stage Lane (MMRR) - Show Lighting Control Elements and cabiling for Project M installation. Fixtures Control wiring and coduit

2/6/2019 - Disney Hollywood Studio - Hubbard Construction Company
950 N Studio Dr - DHS Parking Lot - Install permanent fence and barrier sperating the parking lot from Cypress Rd

2/7/2019 - Disney Hollywood Studio - Sign Producers Inc
950 N Studio Dr - Fabricate DHS Parking Lot Graphics Indicators

2/8/2019 - Disney Springs - Lake Land Llc
B32 Coca Cola, 1512 E Buena Vista Dr - Removal of liquig nitrogen tank and associated controls

2/19/2019 - Downtown Disney - Mitsubishi Electric Power Products Inc
NBA Experience - Design and install screens

2/21/2019 - Disney Hollywood Studio - Pcl Construction Services Inc
700 Theater of the Stars Dr (Tower of Terror) - General Construction

2/21/2019 - Disney Hollywood Studio - Pcl Construction Services Inc
103 Cypress Dr - General Construction

2/21/2019 - Disney Hollywood Studio - Pcl Construction Services Inc
105 Cypress Dr - General Construction

2/21/2019 - Epcot - Brightview Landscape Development
1986 Avenue of the Stars - Provide labor and material for slab construction

2/21/2019 - Grand Floridian - H o a r Construction
4401 Floridian Way (Grand Floridian) - General Construction

2/28/2019 - Disney Hollywood Studio - Scenario Cockram
384 Cypress Dr (Galexy's Edge) - Attachment of wall panel elements (33) anchored to existing facility

2/28/2019 - Disney Springs - Mitsubishi Electric Power Products Inc
1486 E Buena Vista Dr (NBA Experience) - Project DS WS - Video Board

3/4/2019 - Epcot - Whiting Turner Constracting Co
1400 Avenue of the Stars #A - Project G: 200D-1 Enabling Works at North Pathways including sitework, demo, hardscape, landscaping

3/5/2019 - Animal Kingdom - Buena Vista Construction Company
Harambe Train, 805 W Savannah Cir - Provide labor, material and/or electrical for construction

3/5/2019 - Epcot - Murphy Lighting Systems
1830 Avenue of the Stars (Rat) - Show Lighting Controls - Low voltage terminatio and temporary ligthing install

3/12/2019 - - Balfour Beatty
2900 Titan Row,l Bldg #12 - Installation and removal of temporary structures

3/13/2019 - Disney Springs - Hawkeye Construction Of South Florida
1486 East Buena Vists Dr - Construction of new Resturant

3/14/2019 - Beach Club - Barton Malow Company
1900 Epcot Resorts Blvd - Install Jersey barriers, fence and swing gates

3/14/2019 - Epcot - Spitz Inc
1350 Avenue of the Stars (Guardians of the Galaxy) - Fabrication and installation of Show Screens

3/15/2019 - Disney Hollywood Studio - Pcl Construction Services Inc
211 S Studio Dr - (Admin Building) Foundations, slabs, and pre-engineered metal building

3/28/2019 - Disney Hollywood Studio - Southern Exhibitors
864 Sunset Blvd - Installation of 3 billboards and frames 9'W x 5'H

3/29/2019 - Disney Hollywood Studio - Themeworks Incorporated
386 Cypress Dr (Galaxy's Edge) - Installation of prefabricates set for Building 1001

4/1/2019 - Epcot - Beatty Balfour
2900 Titan Row, Suite# 128 - Installation and removal of temporary structures

4/2/2019 - Disney Hollywood Studio - Pro Sound And Video
375, 378, 380, 386, 394, 396 Cypress Dr (Galaxy's Edge) - A/V racks and equipment

4/8/2019 - Contemporary - H o a r Construction
4600 North World Dr (Contemporary) - General Construction

4/8/2019 - Disney Hollywood Studio - Vision Three Sixty Llc
545 Stage Lane - General Construction

4/9/2019 - Epcot - Acomb Ostendorf Associates Llc
1382 Avenue of the Stars (Space Resturant?) - Project management of show components

4/10/2019 - Epcot - Acomb Ostendorf Associates Entertainment And Technical Se...
1382 Avenue of the Stars (Space Resturant) - Project Management of show components

4/11/2019 - Disney Springs - Interstate Signcrafters
NBA Shop (retail) - Interior Decorative Sign

4/11/2019 - Epcot - Balfour Beatty Construction
1360 Avenue of the Stars (Wonders of Life) - Selective interior removal of concrete, steel, framing, finish, irrigation and MEPF including required state-of

4/15/2019 - Disney Hollywood Studio - Mad Creative Fabrication Llc
380, 386, 396 Cypress Dr (Galaxy's Edge) - Install Show Set Pieces at 10010, 10060, and 10070

4/22/2019 - Epcot - Whiting Turner Contracting Co
2002 Avenue of the Stars - Project G: 200D-2 Ancillary Facilities

4/24/2019 - Carribean Beach Resort - Pcl Construction Services Inc
1084C Sea Breeze Dr - Recreation Kiosks

4/24/2019 - Disney Hollywood Studio - Adirondack Scenic Inc
386, 394, 396 Cypress Dr (Galaxy's Edge) - Installation Canopies/Awnings Buildings 1001, 1002 and 1006

5/3/2019 - Epcot - Barton Malow Company
1365 Avenue of the Stars #C - Cast gates to be installed at NE parking lot next to NE pedestrian bridge

5/3/2019 - Epcot - Barton Malow Construction Llc
1365 Avenue of the Stars - Civil and electrical work to support the North East Parking lot

5/3/2019 - Epcot - Barton Malow Company
1713 Epcot Resorts Blvd - Excavate 35 acre storm water pong, outfall storm pipeline and overflow weir

5/3/2019 - Epcot - Barton Malow Company
2025 Avenue of the Stars (Near Seas) - New security booth to be installed, including a pre-manufactured building

5/9/2019 - Disney Hollywood Studio - H o a r Construction
450 Cypress Dr - General Construction

5/13/2019 - Magic Kingdom - Sign Producers Inc
1450 Magic Kingdom Dr #G (Peter Pan's Flight/Harbour House) - Fabricate and install roof sign and blade sign

5/14/2019 - Disney Hollywood Studio - Pro Sound And Video
555 Stage Line (Mickey and Minnies Runaway Railway) - Speakers and AV Equipment

5/14/2019 - Disney Hollywood Studio - Icarus Exhibits Inc
Facility 1001 - 386 Cypress Dr - Fabricate and install food service show element

5/14/2019 - Epcot - Pro Sound And Video
1350 Avenue of the Stars (Guardians) - A/V racks and equipment

5/14/2019 - Epcot - Coastal Steel Inc
1380 Avenue of the Stars (Mission: Space) - General Construction

5/14/2019 - Magic Kingdom - Sign Producers Inc
4965 Caribbean Way (Frontierland) - Fabricate sign and aluminum post and pre-cast foundation and isntall

5/15/2019 - Disney Springs - Hawkeye Construction Of South Florida Inc
The Landings B10 - 1602 E Buena Vista Dr - Patio enclosure

5/21/2019 - Disney Hollywood Studio - Whiting Turner Contracting Company
648, 650 Stage Lane - Demo of existing building

5/21/2019 - Disney Springs - Pro Sound And Video
1478 E Buena Vista Dr (Cirque) - A/V racks and equipment

5/21/2019 - Magic Kingdom - Whiting Turner Contracting Co
4970 N World Dr (Tron) - MK-2 Area Development

5/22/2019 - Epcot - Ready Plumbing And Fire Protection
1474 A Avenue of the Stars (Between Odyssey and Mexico) - Area Development - Ungerground fire Main

5/23/2019 - Disney Hollywood Studio - Pro Sound And Video
555 Stage Lane (Mickey and Minnies Runaway Railroad) - Speakers and AV Equipment

5/23/2019 - Epcot - Whiting Turner Contracting Co
1442 Avenue of the Stars - Project G: 200D-3 Enabling Works at South Pathways. Includes sitework, demo, hardscaping, landscaping

5/23/2019 - Epcot - Cockram Scenario Inc
1830C Avenue of the Stars (Rat) - Installation of show set elements

5/23/2019 - Odyssey - Adirondack Scenic Inc
1460 Avenue of the Stars - Fabrication and buildout of facility and show

5/24/2019 - Epcot - Elite A V Systems Inc
1830 Avenue of the Stars #C (Rat) - Termination and installtion of Show Control System

5/24/2019 - Epcot - Nassal Company
1350 Avenue of the Stars (GotG) - Fabrication and installation of show set pieces

5/30/2019 - Disney Hollywood Studio - Sign Producers Inc
386, 394, 396 Cypress Dr (Galaxy's Edge) - Signs and Electrical

6/5/2019 - Disney Springs - Wartsila North America Inc
1478 E Buena Vista Dr (Cirque) - AV Racks and Equipment

6/7/2019 - Disney Hollywood Studio - Buena Vista Construction Company
151 Ascot Dr (Andy's Lunch Box) - Install and remove set piece

6/12/2019 - Magic Kingdom - Elite A V System Inc
1450 G Magic Kingdom Dr - Termination and installation of the A/V and Show Control System

6/17/2019 - Fort Wilderness - Balfour Beatty Construction
4220 Big Pine Dr - Demo associated with existing utilities, and surrounding configuration

6/18/2019 - Epcot - Icarus Exhibits Inc
1440 Avenue of the Stars #A - Fabricate new Site #36 kiosk

6/18/2019 - Epcot - Icarus Exhibits Inc
1600 Avenue of the Stars #A - Retheme existing Site #13 kiosk

6/19/2019 - Disney Hollywood Studio - Pro Sound And Video
390 Cypress Dr (Galaxy's Edge) - A/Vracks and low voltage terminations

6/20/2019 - Misc - Balfour Beatty Construction
3790 C1 N World Dr, 3790 C2 N World Dr - Install modular office complex for projecdt staff

6/27/2019 - Epcot - Interamerica Stage Inc
1830 C Avenue of the Stars (Rat) - Installation of primary facility connections (rigging), truss assembluies and show set pieces

6/28/2019 - Disney Hollywood Studio - Design Communications Ltd
555 Stage Lane - Install new graphics

6/28/2019 - Epcot - Adirondack Scenic Inc
1350 Avenue of the Stars (Guardians) - Fabrication and Installation of Show Set Elements
 
Last edited:

danlb_2000

Premium Member
Original Poster
7/2/2019 - Fort Wilderness - Lo Temp
Pioneer Hall Kitchen - Relocation of Walk-In-Freezer/Cooler form Backyad BBQ to Pione(r hall)

7/8/2019 - Wilderness Lodge - Balfour Beatty Construction Llc
533 Widerness Way - Utility installation along WW

7/12/2019 - Epcot - Whiting Turner Contracting Co
2000 Avenue of the Stars - Project G : 201

7/15/2019 - Disney Hollywood Studio - Buena Vista Construction Company
Install and remove barricades - 555 Stage Lane #E

7/18/2019 - Disney Hollywood Studio - Design Communications Ltd
565 Cypress Dr - Install new signage

7/18/2019 - Disney Hollywood Studio - Modelwerks Inc
225C Cypress Dr (Indiana Jones Area) - F&B Signage

7/18/2019 - Disney Hollywood Studio - Elite Av Systems
555 Stage Lane - Install and terminate control cabinets

7/18/2019 - Epcot - Elite Av Systems
1830, 1920, 2010 Avenue of the Stars (France, Canada, Land) - AV and Control Installation and termination

7/22/2019 - Disney Hollywood Studio - Buena Vista Construction Company
200 Ascot Dr - Remove existing fence and gate

7/22/2019 - Wilderness Lodge - Balfour Beatty Construction Llc
746 West Wilderness Way - Relocaiton of existing equipment in addition to hardscape and irrigation work

7/22/2019 - Wilderness Lodge - Balfour Beatty Construction Llc
750 West Wilderness Way - Extension of existing structure with new piles that include electrical, plumbing and hardscape work

7/25/2019 - Epcot - Icarus Exhibits Inc
2004 Avenue of the STars #A - Install decor at kiosk #34

7/25/2019 - Epcot - Design Communications Ltd
1460 Avenue of the Stars - Install graphics at Odyssey building

7/25/2019 - Epcot - Mlc Theming Inc
1770 Avenue of the Stars (Italy) - General Construction

7/26/2019 - Coronado Springs - Balfour Beatty Construction Llc
1181 W Buena Vista Dr - Demo of construction trailer utilities

7/26/2019 - Epcot - Buena Vista Construction Company
1460 Avenue of the Stars (Odyssey) - Add DMX cables & Conduit, Add power for VAV boxes

8/5/2019 - Disney Springs - Ac Signs Llc, Decamil
1604 E. Buena Vista Dr - Install braille map

8/6/2019 - Coronado Springs - Balfour Beatty Construction Llc
1067 W Buena Vista Dr - Construct covered storage area

8/6/2019 - Disney Hollywood Studio - Buena Vista Construction Company
555 Stage Lane (Mickey and Minnies Runaway Railroad) - Installation of pre-fabricated show set and pieces

8/7/2019 - Disney Springs - Electrosonic Inc
1478 E. Buena Vista Drive (Cirque) - Install A/V equipment

8/8/2019 - Disney Hollywood Studio - Carriage Works Inc
379 Cypress Dr (GE) - General Construction

8/16/2019 - Epcot - Peninsula Engineering
1374 Avenue of the Stars (Between Wonders and Mission Space0 - Electrical Demolition to support EC BOH Construction access Road

8/20/2019 - Disney Hollywood Studio - Tri City Electrical Contractors
378 Cypress Dr - Electrical Work

8/20/2019 - Disney Hollywood Studio - Faden Builders
379 Cypress Dr - General Construction

8/20/2019 - Disney Hollywood Studio - Carriage Works Inc
379 Cypress Dr - General Construction

8/23/2019 - Disney Hollywood Studio - Jon Richards Company Fl Inc
396 Cypress Dr (Oga's) - Installation of prefabricated scenic wall and speaker tower

8/23/2019 - Disney Hollywood Studio - Jon Richards Company Fl Inc
380 Cypress Dr (Droid Depot) - Installation of prefabricated stairs

8/27/2019 - Fort Wilderness - Balfour Beatty Construction Llc
570,572,574,576,578,580,582,584,720,722,724,726,728 W. Wilderness Way - Structure, utilities and area development

8/30/2019 - Disney Hollywood Studio - Interamerica Stage
555 Stage Lane (Mickey and Minnie's runaway railroad) - Installation of show equipment

9/5/2019 - Epcot - Roebuck Construction Services Inc
1350 Avenue of the Stars (By Guardians) - Backfil existing canal, sheet piles, dewarting

9/6/2019 - Art of Animation Resort - Custom Cable
DAAR Animation Hall - 1850 Animation Way - Cat6A Cabling for Wifi

9/6/2019 - Art of Animation Resort - Custom Cable
DAAR Cozy Cone Pool - 1720 Animation Way - Cat6A Cabling for Wifi

9/6/2019 - Art of Animation Resort - Custom Cable
DAAR Between Buildings 5&6 - 1900 Animation Way - Cat6A Cabling for Wifi

9/6/2019 - Art of Animation Resort - Custom Cable
DARR Big Blue Pool - 1890 Animation Way - Cat6A Cabling for Wifi

9/6/2019 - Art of Animation Resort - Custom Cable
DAAR Flippin Fins Pool-2050 Animation Way - Cat6A Cabling for Wifi

9/6/2019 - Beach Club - Barton Malow
1800 Epcot Resorts Blvd (Beach Club) - Beachs&Cream (F&B) renocation and expansion into adjacent spaces

9/6/2019 - Epcot - Modelwerks Inc
1830 Avenue of the Stars (France) - Project MI Signage

9/9/2019 - Disney Hollywood Studio - Interamerica Stage
Rise of the Resistance - Installation of show set

9/11/2019 - Epcot - Nassal Company
1350 Avenue of the Stars (Guardians) - Fabrication and installation of Show Set Pieces

9/13/2019 - Epcot - Icarus Exhibits Inc
1360 Avenue of the Stars (Play Pavillion) - Fabricate and install show set components

9/13/2019 - Magic Kingdom - Icarus Exhibits Inc
1229 Monorail Way - Fabricate and install show set components

9/17/2019 - Disney Hollywood Studio - Southeastern Construction
South Projection Toer, 547 Stage Lane - Fabrication & Installation of gates/repair & sealing of roof

9/17/2019 - Disney Hollywood Studio - Southeastern Construction
North Projection Tower, 549 Stage Lane - Fabrication & Installation of gates/repair & sealing of roof

9/18/2019 - Epcot - Interamerica Stage
1790 Avenue of the Stars (Morocco) - Truss Erection

9/19/2019 - Disney Hollywood Studio - Mvb Associates Inc
Pixar Emeryville Facades, 571 Stage Lane - Replacing a large video display with a new sign

9/20/2019 - Disney Hollywood Studio - Whiting Turner Contracting Company
648 Stage Lane (Woody's Roundup Resturant) - Facility Package

9/20/2019 - Disney Springs - Hawkeye Construction
B22 - Ample Hills, 1503 E Buena Vista Dr - Interior buld-out

9/20/2019 - Disney Springs - Hawkeye Construction
B10 - Homecoming: 1602 E Buena Vista Dr - Enclose rear exterior patio

9/20/2019 - Epcot - Themeworks Inc
1350 Avenue of the Stars (Guardian) - Installation of show sets

9/25/2019 - Epcot - Jcb Construction Inc
1374 Avenue of the Stars (Near wonders of life) - BOH Fencing, retaining wall and onstage seat wall

9/26/2019 - Fort Wilderness - Balfour Beatty Construction Llc
730, 732, 734, 736 W Wilderness Way - Structure, utilities and area development

10/1/2019 - Epcot - Buena Vista Construction Company
1418 Avenue of the Stars (Mexico) - Relocate structure and pour footings

10/1/2019 - Epcot - Icarus Exhibits Inc
1790 Avenue of the Stars (Morroco) - Fabricate and install show elements

10/3/2019 - Epcot - Whiting Turner Contracting Co
1400 Avenue of the Stars (Innoventions East) - PRoject G: 202-1

10/4/2019 - Carribean Beach Resort - Pcl Construction Services Inc
1092 Cayman Way - Removal of ITJ 3W trailer including utility removal back to point of connection

10/4/2019 - Carribean Beach Resort - Pcl Construction Services Inc
1088 A, 1088 B, 1088 D, 1088 F, and 1090 Cayman Way - Dismantle and remove Construction Trailers

10/7/2019 - Epcot - Murphy Lighting Systems
1830 C Avenue of the Stars (Rat) - Show Lighting controls - Low voltage terminations and remporary lighting install

10/8/2019 - Epcot - Mlc Theming Inc
1984 Avenue of the Stars (Rose Walk) - General Construction

10/9/2019 - Disney Hollywood Studio - Sign Producers Inc
561 Stage Lane - Fabricate and install sign, and connect sign to power

10/10/2019 - Disney Springs - Hawkeye Construction
B10 - Homecoming; 1602 E Buena Vista Dr - Enclode rear exterior patio

10/10/2019 - Disney Springs - Hawkeye Construction
B22 - Amples Hills, 1502 E Buena Vista Dr - Interior build-out

10/10/2019 - Fort Wilderness - Balfour Beatty Construction Llc
632 West Wilderness Way - Structural foundations

10/14/2019 - Epcot - Pro Sound And Video
1350 Avenue of the Stars (Guardians) - Lighting Controls and Equipment

10/21/2019 - Epcot - Ac Signs, Decamil
1830, 1920, 2010 Avenue of the Stars (France, Canada, Land) - Install Signage

10/23/2019 - Epcot - Brightview Landscape Development
3790 C2 N World Dr - Build a retaining wall to be located north-east of construciton site, near natural werland

10/24/2019 - Magic Kingdom - Mlc Theming Inc
4740 Caribbean Way (City Hall) - General Construction

10/25/2019 - Epcot - Whiting Turner Contracting Co
2004 Avenue of the Stars (Innoventions West Restroom) - Project G: RWS

10/31/2019 - Magic Kingdom - Whiting Turner Contracting Co
5601 Pluto Park Ln - MK-2 Plto Park Office Conex Box

11/1/2019 - Disney Hollywood Studio - H o a r Construction Llc
555 Stage Lane (Mickey and Minnie Runaway Railroad) - DHS Project M - Package 1 Work

11/7/2019 - Epcot - Buena Vista Construction Company
1984 Avenue of the Stars (Rose Walk) - Site development and utility modificaitons

11/7/2019 - Epcot - Buena Vista Construction Company
1378 Avenue of the Stars (Near Misson Space) - Area Development Pathway Improvements

11/8/2019 - Beach Club - Johnson Lancaster And Associates Inc
Disney's Beach Club Resort - Beaches & Cream (FB) renovation and expansion into adjacnet spaces

11/11/2019 - Various - Buena Vista Construction Company
730 Theater of the Stars, 2050 Avenue of the Stars, 611 Rainforest Rd - Install utilities for A/V equipment

11/14/2019 - Disney Hollywood Studio - Buena Vista Construction Company
555 Stage Lane (Mickey and Minnie's Runaway Railroad) - Install barriers with gates

11/14/2019 - Epcot - Buena Vista Construction Company
1990 Avenue of the Stars #K (Rosewalk) - Provide labor, material and/or electical for construction

11/14/2019 - Epcot - Buena Vista Construction Company
1990 Avenue of the Stars #H (Rosewalk) - Provide labor, material and/or electical for construction

11/14/2019 - Epcot - Buena Vista Construction Company
1990 Avenue of the Stars #J (Rosewalk) - Provide labor, material and/or electical for construction

11/14/2019 - Epcot - Buena Vista Construction Company
1990 Avenue of the Stars #G (Rosewalk) - Provide labor, material and/or electical for construction

11/14/2019 - Epcot - Buena Vista Construction Company
1990 Avenue of the Stars #F (Rosewalk) - Provide labor, material and/or electical for construction

11/18/2019 - Disney Springs - Buena Vista Construction Company
DS - Digital Reader Board (Near WOD) - Provide labor, material and/or electrical for construction

11/19/2019 - Epcot - Icarus Exhibits Inc
1776 Avenue of the Stars (Reagle Eagle Smokehouse?) - Fabricate and install arch and monitor covers

11/19/2019 - Magic Kingdom - Sign Producers Inc
1254 Magic Kingdom Dr (Speedway) - Install and Connect Billboard to Power

11/22/2019 - Disney Springs - Focus Electrical Services
1500 East Buena Vista Dr (AMC) - Temporary Installation of Cartoon Figures in Planter

11/22/2019 - Disney Springs - Buena Vista Construction Company
1680 E Buena Vista Dr - DS - WOD Adorables Lights Install

11/26/2019 - Disney Springs - I2 Visual Inc
City Works Signage - 1486 A E Buena Vista Dr West Side City Works Building

11/26/2019 - Epcot - Whiting Turner Contracting Co
1348 Avenue of the Stars - EC Project G: Faility 205 Upgrades

11/27/2019 - Epcot - Ac Signs, Decamil
1776 Avenue of the Stars (America) - Install marquee sign

12/9/2019 - Disney Hollywood Studio - Sign Producers Inc
555 Stage Lane (Mickey and Minnie's Runaway Railroad) - Fabricate and install sign and connect sign to power provided by owner

12/11/2019 - Epcot - Sign Producers Inc
1992, 1478 Avenue of the Stars - Install existing show elements

12/12/2019 - Epcot - Sign Producers Inc
1776 Avenue of the Stars - Fabricate and install signes and connect signs to power provided by owner

12/12/2019 - Fort Wilderness - Bruns Inc General Contractors
FT Wilderness Mining Tower, FW Campground, 3940 Pine Rd - A new guest ineractive feature to wash sand
 
Last edited:

TraderSam

Member
A few notes about the purpose of this thread...

Despite the name, this thread actually lists Notices of Commencement (NOCs) for construction projects around the WDW property. A NOC is a document that must be filed before work on a specific project can begin and is usually filed shortly before work starts. It's main purpose is to assure that contractors get paid on time once the work is complete. NOCs will sometimes have an explicit expiration date, but most of the time a date is not specified in which case they expire one year from the filing date.

The documents generally don't contain much information. They will list the location where the work is being done, for example the name of a ride or store. They also show a description of the work being done which is normally very vague, for example "Electrical" or "Construction". Some of the NOCs I post will just say "BVCC". This stands for Buena Vista Construction Company which is Disney's internal construction company. The work description on BVCC permits is almost always the very vague "Provide labor, material and/or electrical for construction".

Unlike previous years, I have stopped posting every permit since most do not contain any useful information. When I do find interesting permits I will post them here and will usually post them in the applicable thread.

Previous Years
2018
2017
2016
2015
2014
2013
2012
2011
Can’t tell you how much I love these threads. Thank you!!!
 

wdwjmp239

Well-Known Member
Not too sure where to put this question, but if it needs to be moved to a different threat, please relocate it. :)

I was heading west on I-4 heading towards Tampa on Sunday (3/3/19) and noticed what looked like a new hotel going up to the west of Disney Springs. Does anyone have any clue to what hotel this is? Disney owned? Marriott owned (saw something called "The Cove") on a few searches that came up before I thought I would ask here. Would appreciate the info! Thank you!
 

danlb_2000

Premium Member
Original Poster
Not too sure where to put this question, but if it needs to be moved to a different threat, please relocate it. :)

I was heading west on I-4 heading towards Tampa on Sunday (3/3/19) and noticed what looked like a new hotel going up to the west of Disney Springs. Does anyone have any clue to what hotel this is? Disney owned? Marriott owned (saw something called "The Cove") on a few searches that came up before I thought I would ask here. Would appreciate the info! Thank you!

You are probably seeing the JW Marriott Orlando Bonnet Creek expansion. The Cove is the new hotel associated with the Swan and Dolphin, but that one hasn't gone vertical yet.

 

NiarrNDisney

Well-Known Member
Last edited:

danlb_2000

Premium Member
Original Poster
Bunch of permits this week for infrastructure work around Epcot. The pond is the one by the Solar farm and I believe that the parking lot is the new one they are building behind GotG.

5/3/2019 - Epcot - Barton Malow Company
1365 Avenue of the Stars #C - Cast gates to be installed at NE parking lot next to NE pedestrian bridge

5/3/2019 - Epcot - Barton Malow Construction Llc
1365 Avenue of the Stars - Civil and electrical work to support the North East Parking lot

5/3/2019 - Epcot - Barton Malow Company
1713 Epcot Resorts Blvd - Excavate 35 acre storm water pong, outfall storm pipeline and overflow weir

5/3/2019 - Epcot - Barton Malow Company
2025 Avenue of the Stars (Near Seas) - New security booth to be installed, including a pre-manufactured building
 