tl77
Well-Known Member
has it been confirmed yet or not if they are simply using the existing track and this being a boat/water ride... or will they redo all of that and use much more of the building space (many of us didn't know existed haha)
I'd think if they were simply reusing the existing track it wouldn't take 2 years to complete, and they did haul off the old boats so that at least that will be new. Plus the majority of the old ride was on the second floor, it seems like "if" they were going to expand the ride the second floor lounge would be the place to do it, but considering how mad so many people are that this is happening this Frozen ride better be amazing or there'll riots in the street