If they build an entrance/exit around the haunted mansion queue I’m curious how they’ll do this unless they plan on docking the riverboat
They are probably going to loop it back to HM but I feel like the park would flow a lot better if you tore out the Village Haus and bathroom and built a path between IASW and NFL. Would need to build what is effectively a bridge over the northern utilidor portal and maybe that work would hurt operations.
Got it. Yea, I suggested that this would be a possibility, but my concern is that the right arrow represents a long empty pathway. It wouldn’t be the end of the world, but it wouldn’t be great either because it still means getting to that new land is kind of a pain from the right side of the park.
I think you can tell an interesting all ages story that teams up a significant amount of villains from the Renaissance/adjacent roster. Jafar, Hades, Ursula, and Yzma would all play very well off each other: supernaturally powerful villains brought to life by real scenery chewing performances.I still don't think a Villains' Land is such a good idea. I'd much rather have, say, an Aladdin dark ride than an exclusively Jafar dark ride, or a Hercules ride over an exclusively Hades ride.
The covered Arcades that flank the East and West sides of Main Street at Disneyland Paris are one of the park's most clever, useful, and beautiful flourishes. They also let into all the Main Street shops from the back sides, which allows for continued shopping during parades, storms, and fireworks shows while also permitting guest flow in and out of the park:MK definitely needs to "buildout" Main Street in order for the bypass to be open all-day. Hoping this is a smaller project that gets approved.
As opposed to something like this:Got it. Yea, I suggested that this would be a possibility, but my concern is that the right arrow represents a long empty pathway. It wouldn’t be the end of the world, but it wouldn’t be great either because it still means getting to that new land is kind of a pain from the right side of the park.
I would say close to zero percent chance that area is accessible to park guests before Holiday season 2029.Exactly. There is a lot of work required to make the land usable for park expansion, so I presume it will be awhile before we get concrete details on attractions. DAK will be a focus at D23 this yea since that work begins soon.
Got it. Yea, I suggested that this would be a possibility, but my concern is that the right arrow represents a long empty pathway. It wouldn’t be the end of the world, but it wouldn’t be great either because it still means getting to that new land is kind of a pain from the right side of the park.
Oh, you shouldn't have gone and said that.... now they will want to prove you wrong...I don’t think they’d build another stand-alone deluxe resort. Can’t fill what they have.
Wouldn't it be redundant to have Ursula in the attraction when she's already featured in an attraction in the park?I think you can tell an interesting all ages story that teams up a significant amount of villains from the Renaissance/adjacent roster. Jafar, Hades, Ursula, and Yzma would all play very well off each other: supernaturally powerful villains brought to life by real scenery chewing performances.
The MK expansion? For the most part, that’s likely accurate although they could open a walkway north of RoA early if they want. They did so at DAK while still building EE. It would be nice to be able to walk past a mountain under construction again. Been awhile.I would say close to zero percent chance that area is accessible to park guests before Holiday season 2029.
I’d love it. Especially if they ever considered dropped the villains moniker for just a general spooky type land.
i don’t really think that should factor into itWouldn't it be redundant to have Ursula in the attraction when she's already featured in an attraction in the park?
This confirmation makes me think they are ready to execute at least half a plan, I guess we will find out later this year exactly what they are thinking. In my mind 2 years, I had imagined them building the Frontierland expansion half and the Villains half as two separate creative projects that shared some infrastructure work. Maybe the Frontierland expansion opens in 2029-2030 and an empty loop gets filled in over the next 2-3 years after that?The MK expansion? For the most part, that’s likely accurate although they could open a walkway north of RoA early if they want. They did so at DAK while still building EE. It would be nice to be able to walk past a mountain under construction again. Been awhile.
A secondary entrance seems almost mandatory at this point to handled the increased park capacity. That and/or upgrading the MS bypass into a constant onstage area with stronger theming.
Main Street, as is, can’t handle much more. Even Disneyland has a secondary access with the monorail station.
The big question in my mind is how they’d direct more than one or two resort’s worth of guests to a secondary entrance. There’s a lot of different ways to attack it, but each has their own drawbacks.