PERMITS

TP2000

Well-Known Member

BLD2019-03181Electrical to support DCA - Award Weiners/301
BLD2019-03207Disney - North Service Area / Roundhouse - Bldg 9058 - Change of Use: (S1 to B occupancy) 830 sq.ft built interior walls within existing exterior metal siding to create cyber equipment test lab and work room. Exterior poured in place pad for electrical, mechanical equipments.

"to create cyber equipment test lab and work room"?

That sounds dangerous, especially if the experiments were to escape!

But I'm sure there are plenty of safety protocols in place, so nothing to worry about.
 

Disney Irish

Premium Member
"to create cyber equipment test lab and work room"?

That sounds dangerous, especially if the experiments were to escape!

But I'm sure there are plenty of safety protocols in place, so nothing to worry about.
Is Disneyland the ultimate starting location of Skynet?

It’s coming I tell you....
 

MisterPenguin

President of Animal Kingdom
Premium Member
"to create cyber equipment test lab and work room"?

That sounds dangerous, especially if the experiments were to escape!

But I'm sure there are plenty of safety protocols in place, so nothing to worry about.

We have plenty of experiments to run and research to be done on the people who are still alive.

 

truecoat

Well-Known Member
"to create cyber equipment test lab and work room"?

That sounds dangerous, especially if the experiments were to escape!

But I'm sure there are plenty of safety protocols in place, so nothing to worry about.
Those two words bring back bad memories.
 

SSG

Well-Known Member
Original Poster
BLD2019-03261DCA - Paradise Pier Enhancements - Area Development / adjacent to Inside out ride Bldg 513 - Tenant Improvement: Three handi-hut structures for ride operation and maintenance with concrete slab, electical
SGN2019-00153Install (1) illuminated blade sign for "SPLITSVILLE".
 

SSG

Well-Known Member
Original Poster
BLD2019-03423Plumbing to support DCA - Golden State Expansion / Pkg3 / Bldg 751
BLD2019-03441Electrical to support new GFCI receptacles at Mickey and Friends Parking Structure.
BLD2019-03442Electrical to support - Disneyland - West Entry - Vacation Club Kiosk - New electrical and 100 amp service. REF: BLD2019-02706
 

SSG

Well-Known Member
Original Poster
BLD2019-03553 Tenant Improvement: (Chiller 2) Remove (1) water cooled chiller, (2) chilled water pumps and extend equipment pad with pour in place concrete 56 s.ft. "Police Department". REF:BLD2018-00892 / BLD2018-00893 (Phase 2)

BLD2019-03555 Plumbing to support DCA - Golden State Expansion - Area Development 750

BLD2019-03556 Mechanical to support DCA - Golden State Expansion - Area Development 750

BLD2019-03565 Electrical to support BLD2019-01268 for Disney - Adventureland.

BLD2019-03572 Dinsneyland - BOH / West Service Road - Electrical to install new copper conductors within existing conduit run.

BLD2019-03466 Disney - BOH - Site area adjacent to Show Overhaul Building #9073 - Modification of the existing stormceptor to a dry weather flow pump station with installation of new valve vault.

BLD2019-03564 Electrical to support BLD2019-03223 for Disneyland Hotel - Convention Center Banquet Kitchen.

BLD2019-03568 Disneyland Hotel - Convention Center Banquet Kitchen - Mechanical to support tenant improvement for BLD2019-03223.

BLD2019-03554 Plumbing to support TDA - Auditorium Flex Space - Tenant Improvement REF: BLD2019-01366
 

Register on WDWMAGIC. This sidebar will go away, and you'll see fewer ads.

Back
Top Bottom