Here we go again......
4/25/2008
DTD
Repair automatic bus gate
Epcot
Renovate offices at Inoventions
AK
Regrade berm in Kudu enclosure
MK
Replace Native hut
Replace canopy on boat dock
Replace trench drain @ Railroad underpass.
DHS
Scope of work not given. Address points to Catastrophe Canyon.
Provide power to new receptacles at Tatooine Traders.
4/28/2008
DHS
Soundstage 4 A/V installation support.
4/29/2008
Epcot
Install interactive distribution cart (Norway, Italy and International gateway
DHS
Replace 11 windows and 4 doors at 50's Prime Time
Ft Wilderness
Widen ACC roadway through entrance turn
ACC roadway widening
North Service Area
Install cooler doors
DTD
Install low voltage access and CCTV at Guest Relations
4/30/2008
Epcot
Replace drain under dish machine at Coral Reef.
5/01/2008
Poly
Repair sidewalks.
GF
Repair Sidewalks
PI
Modify 4 bar tops at Motion
Ft Wilderness
Replace 7 wood posts at Pioneer Hall
Epcot
China pavilion FACP (Fire alarm control panel?) replacement and restaurant upgrade
5/2/2008
DTD
Install low voltage cabling at Guest relations.
Rehab Captain Jack's
AK
New walk in cooler in elephant barn
Install new lights and poles at hippo pad
Install new unload console on Dinosaur
Install new hardscape on Discovery Island
Install new hardscape at caravan stage in Asia
MK
Install new wheelchair guest entry queue
Epcot
Install new research kiosk at the seas
WWS
Install new fireproof cabinet
WL
Install new curb in kitchen of WCC
5/6/2008
Y&BC
Replace damaged walls and flooring
Polish concrete floor in convention center
Install copper caps on all pilings
Repair floor and ceiling in Stormalong bay pool equipment room
MK
Install ice machine at CRT
Rehab storage space at Splash mountain
Remove and replace deck at Aunt Polly's on TSI
Repaint facade of IASW
Remove and reinstall wood deck in FL
Contemporary
New coffee counter in lobby
5/13/2008
POP and PORS
Modify soft drink dispensers
Epcot
Install new carpet in UoE preshow
DHS
Upgarade HVAC in backstage security kiosk
Narnia improvements
Poly
Repair gable ends on building #9
AK
New concrete pad in Elephant barn
MK
Excavate and install conduit on JC
5/15/2008
Contemporary
The Wave marque package
Update and refresh 4th floor resturants
Replace 5th floor tower and skylights
Refresh room service kitchen
Replace heat exchanger
Upgrade emergency lights on 14th floor
MK
Install cameras in Pecos Bill's
Epcot
Install network cabling in the Land
Install network cabling in the Seas
Install network cabling backstage at Soarin
DHS
Replaced chilled water valve backstage
Replace chilled water valve backstage
Replace chilled water valve backstage
Boardwalk
Replace damaged sidewalks
Y&BC
Replace damaged sidewalks
Replace bolts on slide
Poly
Install heat exchanger in great ceremonial house
CBR
Finish painting on Martinique and Jamaica buildings
PORS
Replace damaged sidewalks.
5/19/2008
MK Backstage
Disc bldg power diversity phase 2
office rehab
MK
Install conduit and wire for new 40 hp pump in PotC
DTD
Install security system in guest relations
5/20/2008
DTD
Install operation graphics package
New drain line.
MK Backstage
New parade dressing room
5/21/2008
DEG building (located in service area behind PORS)
Install electrical outlets
5/22/2008
DHS?
Haines identity graphics package
Epcot
Demolish 9 Dragons restaurant kitchen
Repair and repaint hotel roof in Canada pavilion
TTC
Repipe mechanical room
5/27/2008
Epcot
Replace pumps and motors for Denitrification systems at living seas
DTD
Replace covered stage
MK
Install cameras backstage at stroller rental office
5/28/2008
Epcot
Repair sanitary drain at Mexico pavilion.
5/29/2008
Epcot
Install new carpet at Le Cellier
Install new network cabling at HISTK
Install push button door at CM services.
Install new carpet at corner shop in Germany.
Install push button door at cast entrance of the Odyssey
MK
Install solar hot water heaters at wardrobe building.
Replace AHU on Main Street.
Replace all TTA speakers.
Replace AHU on Main Street
Replace AHU on Main Street.
AK
Add console to south unload station of Dinosaur.
Install solar hot water heaters at forage house
POP
Add new exterior light fixture
DHS
Demo grade and install new CN break room.
DTD
Replace AHU on world of memories building
Contemporary
DVC kiosk rehab.
6/3/2008
Near Epcot
Remove existing sign and rotate 180 degrees
Epcot
Refurb castle in Japan pavilion
Refurb Nine Dragons and gate in China pavilion
Install 120v photo equipment in Imagination pavilion
Install conduit from telephone room to manhole EC PICO bldg
MK Car care center
Relocate security kiosk
CS
Install 2 new chair lift sleeves at dig site pool
CBR
Replace AC ducts in Old Point Royal
4 Seasons construction site.
Install smoke detectors in trailer
6/3/2008
Epcot
Marque for Storm Struck
BC
General refurb.
LBV golf course
Replace awning on pro shop
GF
Replace HVAC in pool building
DC-2 Warehouse
Replace fire doors
Team Disney
Upgrade hood in kitchen
DHS
Design and install new sign support for Car's character backdrop at Al's toy barn
6/6/2008
MK
Install sprinkler system in Splash Mountain storage shed
Epcot
Install sprinkler system in China food Kiosk
GF
Paint building #9
AK
New merchandise cart in Serka Zong Bazaar
6/9/2008
Backstage
Install dishwasher and exhaust hood
MK
Install cameras at BTMRR
Install cameras in HoP
Install domestic solar powered hot water heaters in wardrobe building
SSR
New circuit for new show oven in Artist's Pallet
6/10/2008
AK
Install solar hot water heaters in forage building
Backstage
Install new dock door at DC3
Epcot
Refurb Quanset huts 2 and 3 behind living seas
Replace two chilled water AC units in Nine Dragons
Install network cable in Mexico costuming building
DTD
Install new gas boiler at Food Quest
Y&BC
Replace 4 doors and 29 windows
6/12/2008
AK
Install new ozone water treatment equipment
Install new ozone water treatment equipment
MK
Provide power, phone and data lines to new cash wrap counter in the Emporium
Boardwalk
Renovate 374 guest rooms
CBR
Renovate 1728 guest rooms
Four Seasons
Mass grading package
6/13/2008
DHS
Install automatic door opener in cast member services
Install automatic door opener in IP learning center
New cell tower
MK
Repair existing facade at Casey's Corner
Epcot
Demo wall and install new metal stud wall at Soarin
New cell tower
Water treatment facility
New cell tower
Contemporary
New roof mounted cell tower
6/18/2008
DHS
Install ice machines at OPS 3 building
Phase 2 of painting and caulking Animation office
Epcot
Replace ceiling tiles in Akershus kitchen
MK
Replace bitumen roof on SGE queue
6/19/2008
Boardwalk
Renovate 374 guest rooms
MK
Install new hopper, cyclone, compacter and filler in AV AC building
Install new tank a fueling system at Tomorrowland speedway
Install new topping bar at Pecos Bill's
Install 3 drink towers at Columbia Harbor house
Modify power distribution systems in Fantasyland substation
Install new rooftop AC unit on AV AC building
Fantasyland mechanical room/ power distribution modifications
Epcot
Replace dry storage with walk in cooler in UK
Replace wooden stairs with aluminum stairs backstage at American Adventure
Refurb kitchen and dinning room at Nine Dragons
AK
Replace carved animal motifs at Island Mercantile
CBR
Install new 208v outlet in deli
6/23/2008
Epcot
Electrical package for WDI trailer
6/24/2008
Install new emitters for audio description project. Locations include Phillarmagic, CBJ, The Land, TSM and LMA
Install sinage on Apopka Vineland rd
Install new electrical service for new ironer at laundry facility
Install new ironer at laundry facility
Ft Wilderness
Replace cabin doors
DHS
Construct metal framed screen at back of house gate for Mickey Ave widening
6/25/2008
DWWS
Operational graphics package.
6/26/2008
AK
Install new trench at dry bird quarantine
Monorail Shop
Modift 3 roll up doors
DC-3 Warehouse
Add modular office
4/25/2008
DTD
Repair automatic bus gate
Epcot
Renovate offices at Inoventions
AK
Regrade berm in Kudu enclosure
MK
Replace Native hut
Replace canopy on boat dock
Replace trench drain @ Railroad underpass.
DHS
Scope of work not given. Address points to Catastrophe Canyon.
Provide power to new receptacles at Tatooine Traders.
4/28/2008
DHS
Soundstage 4 A/V installation support.
4/29/2008
Epcot
Install interactive distribution cart (Norway, Italy and International gateway
DHS
Replace 11 windows and 4 doors at 50's Prime Time
Ft Wilderness
Widen ACC roadway through entrance turn
ACC roadway widening
North Service Area
Install cooler doors
DTD
Install low voltage access and CCTV at Guest Relations
4/30/2008
Epcot
Replace drain under dish machine at Coral Reef.
5/01/2008
Poly
Repair sidewalks.
GF
Repair Sidewalks
PI
Modify 4 bar tops at Motion
Ft Wilderness
Replace 7 wood posts at Pioneer Hall
Epcot
China pavilion FACP (Fire alarm control panel?) replacement and restaurant upgrade
5/2/2008
DTD
Install low voltage cabling at Guest relations.
Rehab Captain Jack's
AK
New walk in cooler in elephant barn
Install new lights and poles at hippo pad
Install new unload console on Dinosaur
Install new hardscape on Discovery Island
Install new hardscape at caravan stage in Asia
MK
Install new wheelchair guest entry queue
Epcot
Install new research kiosk at the seas
WWS
Install new fireproof cabinet
WL
Install new curb in kitchen of WCC
5/6/2008
Y&BC
Replace damaged walls and flooring
Polish concrete floor in convention center
Install copper caps on all pilings
Repair floor and ceiling in Stormalong bay pool equipment room
MK
Install ice machine at CRT
Rehab storage space at Splash mountain
Remove and replace deck at Aunt Polly's on TSI
Repaint facade of IASW
Remove and reinstall wood deck in FL
Contemporary
New coffee counter in lobby
5/13/2008
POP and PORS
Modify soft drink dispensers
Epcot
Install new carpet in UoE preshow
DHS
Upgarade HVAC in backstage security kiosk
Narnia improvements
Poly
Repair gable ends on building #9
AK
New concrete pad in Elephant barn
MK
Excavate and install conduit on JC
5/15/2008
Contemporary
The Wave marque package
Update and refresh 4th floor resturants
Replace 5th floor tower and skylights
Refresh room service kitchen
Replace heat exchanger
Upgrade emergency lights on 14th floor
MK
Install cameras in Pecos Bill's
Epcot
Install network cabling in the Land
Install network cabling in the Seas
Install network cabling backstage at Soarin
DHS
Replaced chilled water valve backstage
Replace chilled water valve backstage
Replace chilled water valve backstage
Boardwalk
Replace damaged sidewalks
Y&BC
Replace damaged sidewalks
Replace bolts on slide
Poly
Install heat exchanger in great ceremonial house
CBR
Finish painting on Martinique and Jamaica buildings
PORS
Replace damaged sidewalks.
5/19/2008
MK Backstage
Disc bldg power diversity phase 2
office rehab
MK
Install conduit and wire for new 40 hp pump in PotC
DTD
Install security system in guest relations
5/20/2008
DTD
Install operation graphics package
New drain line.
MK Backstage
New parade dressing room
5/21/2008
DEG building (located in service area behind PORS)
Install electrical outlets
5/22/2008
DHS?
Haines identity graphics package
Epcot
Demolish 9 Dragons restaurant kitchen
Repair and repaint hotel roof in Canada pavilion
TTC
Repipe mechanical room
5/27/2008
Epcot
Replace pumps and motors for Denitrification systems at living seas
DTD
Replace covered stage
MK
Install cameras backstage at stroller rental office
5/28/2008
Epcot
Repair sanitary drain at Mexico pavilion.
5/29/2008
Epcot
Install new carpet at Le Cellier
Install new network cabling at HISTK
Install push button door at CM services.
Install new carpet at corner shop in Germany.
Install push button door at cast entrance of the Odyssey
MK
Install solar hot water heaters at wardrobe building.
Replace AHU on Main Street.
Replace all TTA speakers.
Replace AHU on Main Street
Replace AHU on Main Street.
AK
Add console to south unload station of Dinosaur.
Install solar hot water heaters at forage house
POP
Add new exterior light fixture
DHS
Demo grade and install new CN break room.
DTD
Replace AHU on world of memories building
Contemporary
DVC kiosk rehab.
6/3/2008
Near Epcot
Remove existing sign and rotate 180 degrees
Epcot
Refurb castle in Japan pavilion
Refurb Nine Dragons and gate in China pavilion
Install 120v photo equipment in Imagination pavilion
Install conduit from telephone room to manhole EC PICO bldg
MK Car care center
Relocate security kiosk
CS
Install 2 new chair lift sleeves at dig site pool
CBR
Replace AC ducts in Old Point Royal
4 Seasons construction site.
Install smoke detectors in trailer
6/3/2008
Epcot
Marque for Storm Struck
BC
General refurb.
LBV golf course
Replace awning on pro shop
GF
Replace HVAC in pool building
DC-2 Warehouse
Replace fire doors
Team Disney
Upgrade hood in kitchen
DHS
Design and install new sign support for Car's character backdrop at Al's toy barn
6/6/2008
MK
Install sprinkler system in Splash Mountain storage shed
Epcot
Install sprinkler system in China food Kiosk
GF
Paint building #9
AK
New merchandise cart in Serka Zong Bazaar
6/9/2008
Backstage
Install dishwasher and exhaust hood
MK
Install cameras at BTMRR
Install cameras in HoP
Install domestic solar powered hot water heaters in wardrobe building
SSR
New circuit for new show oven in Artist's Pallet
6/10/2008
AK
Install solar hot water heaters in forage building
Backstage
Install new dock door at DC3
Epcot
Refurb Quanset huts 2 and 3 behind living seas
Replace two chilled water AC units in Nine Dragons
Install network cable in Mexico costuming building
DTD
Install new gas boiler at Food Quest
Y&BC
Replace 4 doors and 29 windows
6/12/2008
AK
Install new ozone water treatment equipment
Install new ozone water treatment equipment
MK
Provide power, phone and data lines to new cash wrap counter in the Emporium
Boardwalk
Renovate 374 guest rooms
CBR
Renovate 1728 guest rooms
Four Seasons
Mass grading package
6/13/2008
DHS
Install automatic door opener in cast member services
Install automatic door opener in IP learning center
New cell tower
MK
Repair existing facade at Casey's Corner
Epcot
Demo wall and install new metal stud wall at Soarin
New cell tower
Water treatment facility
New cell tower
Contemporary
New roof mounted cell tower
6/18/2008
DHS
Install ice machines at OPS 3 building
Phase 2 of painting and caulking Animation office
Epcot
Replace ceiling tiles in Akershus kitchen
MK
Replace bitumen roof on SGE queue
6/19/2008
Boardwalk
Renovate 374 guest rooms
MK
Install new hopper, cyclone, compacter and filler in AV AC building
Install new tank a fueling system at Tomorrowland speedway
Install new topping bar at Pecos Bill's
Install 3 drink towers at Columbia Harbor house
Modify power distribution systems in Fantasyland substation
Install new rooftop AC unit on AV AC building
Fantasyland mechanical room/ power distribution modifications
Epcot
Replace dry storage with walk in cooler in UK
Replace wooden stairs with aluminum stairs backstage at American Adventure
Refurb kitchen and dinning room at Nine Dragons
AK
Replace carved animal motifs at Island Mercantile
CBR
Install new 208v outlet in deli
6/23/2008
Epcot
Electrical package for WDI trailer
6/24/2008
Install new emitters for audio description project. Locations include Phillarmagic, CBJ, The Land, TSM and LMA
Install sinage on Apopka Vineland rd
Install new electrical service for new ironer at laundry facility
Install new ironer at laundry facility
Ft Wilderness
Replace cabin doors
DHS
Construct metal framed screen at back of house gate for Mickey Ave widening
6/25/2008
DWWS
Operational graphics package.
6/26/2008
AK
Install new trench at dry bird quarantine
Monorail Shop
Modift 3 roll up doors
DC-3 Warehouse
Add modular office