WDW Permits part 2

Master Yoda

Pro Star Wars geek.
Premium Member
Original Poster
Here we go again......

4/25/2008

DTD
Repair automatic bus gate

Epcot
Renovate offices at Inoventions

AK
Regrade berm in Kudu enclosure

MK
Replace Native hut
Replace canopy on boat dock
Replace trench drain @ Railroad underpass.

DHS
Scope of work not given. Address points to Catastrophe Canyon.
Provide power to new receptacles at Tatooine Traders.

4/28/2008

DHS
Soundstage 4 A/V installation support.

4/29/2008

Epcot
Install interactive distribution cart (Norway, Italy and International gateway

DHS
Replace 11 windows and 4 doors at 50's Prime Time

Ft Wilderness
Widen ACC roadway through entrance turn
ACC roadway widening

North Service Area
Install cooler doors

DTD
Install low voltage access and CCTV at Guest Relations

4/30/2008

Epcot
Replace drain under dish machine at Coral Reef.

5/01/2008

Poly
Repair sidewalks.

GF
Repair Sidewalks

PI
Modify 4 bar tops at Motion

Ft Wilderness
Replace 7 wood posts at Pioneer Hall

Epcot
China pavilion FACP (Fire alarm control panel?) replacement and restaurant upgrade

5/2/2008

DTD
Install low voltage cabling at Guest relations.
Rehab Captain Jack's

AK
New walk in cooler in elephant barn
Install new lights and poles at hippo pad
Install new unload console on Dinosaur
Install new hardscape on Discovery Island
Install new hardscape at caravan stage in Asia

MK
Install new wheelchair guest entry queue

Epcot
Install new research kiosk at the seas

WWS
Install new fireproof cabinet

WL
Install new curb in kitchen of WCC

5/6/2008

Y&BC
Replace damaged walls and flooring
Polish concrete floor in convention center
Install copper caps on all pilings
Repair floor and ceiling in Stormalong bay pool equipment room

MK
Install ice machine at CRT
Rehab storage space at Splash mountain
Remove and replace deck at Aunt Polly's on TSI
Repaint facade of IASW
Remove and reinstall wood deck in FL

Contemporary
New coffee counter in lobby

5/13/2008

POP and PORS
Modify soft drink dispensers

Epcot
Install new carpet in UoE preshow

DHS
Upgarade HVAC in backstage security kiosk
Narnia improvements

Poly
Repair gable ends on building #9

AK
New concrete pad in Elephant barn

MK
Excavate and install conduit on JC

5/15/2008

Contemporary
The Wave marque package
Update and refresh 4th floor resturants
Replace 5th floor tower and skylights
Refresh room service kitchen
Replace heat exchanger
Upgrade emergency lights on 14th floor

MK
Install cameras in Pecos Bill's

Epcot
Install network cabling in the Land
Install network cabling in the Seas
Install network cabling backstage at Soarin

DHS
Replaced chilled water valve backstage
Replace chilled water valve backstage
Replace chilled water valve backstage

Boardwalk
Replace damaged sidewalks

Y&BC
Replace damaged sidewalks
Replace bolts on slide

Poly
Install heat exchanger in great ceremonial house

CBR
Finish painting on Martinique and Jamaica buildings

PORS
Replace damaged sidewalks.

5/19/2008

MK Backstage

Disc bldg power diversity phase 2
office rehab

MK
Install conduit and wire for new 40 hp pump in PotC

DTD
Install security system in guest relations

5/20/2008

DTD
Install operation graphics package
New drain line.

MK Backstage
New parade dressing room

5/21/2008

DEG building (located in service area behind PORS)
Install electrical outlets


5/22/2008

DHS?
Haines identity graphics package

Epcot
Demolish 9 Dragons restaurant kitchen
Repair and repaint hotel roof in Canada pavilion

TTC
Repipe mechanical room

5/27/2008

Epcot

Replace pumps and motors for Denitrification systems at living seas

DTD

Replace covered stage

MK

Install cameras backstage at stroller rental office
5/28/2008

Epcot

Repair sanitary drain at Mexico pavilion.

5/29/2008

Epcot

Install new carpet at Le Cellier
Install new network cabling at HISTK
Install push button door at CM services.
Install new carpet at corner shop in Germany.
Install push button door at cast entrance of the Odyssey

MK

Install solar hot water heaters at wardrobe building.
Replace AHU on Main Street.
Replace all TTA speakers.
Replace AHU on Main Street
Replace AHU on Main Street.

AK

Add console to south unload station of Dinosaur.
Install solar hot water heaters at forage house

POP

Add new exterior light fixture

DHS

Demo grade and install new CN break room.

DTD

Replace AHU on world of memories building

Contemporary

DVC kiosk rehab.

6/3/2008

Near Epcot

Remove existing sign and rotate 180 degrees

Epcot

Refurb castle in Japan pavilion
Refurb Nine Dragons and gate in China pavilion
Install 120v photo equipment in Imagination pavilion
Install conduit from telephone room to manhole EC PICO bldg

MK Car care center
Relocate security kiosk

CS
Install 2 new chair lift sleeves at dig site pool

CBR
Replace AC ducts in Old Point Royal

4 Seasons construction site.
Install smoke detectors in trailer

6/3/2008

Epcot

Marque for Storm Struck

BC

General refurb.

LBV golf course

Replace awning on pro shop

GF
Replace HVAC in pool building

DC-2 Warehouse

Replace fire doors

Team Disney
Upgrade hood in kitchen

DHS
Design and install new sign support for Car's character backdrop at Al's toy barn

6/6/2008

MK

Install sprinkler system in Splash Mountain storage shed

Epcot

Install sprinkler system in China food Kiosk

GF

Paint building #9

AK

New merchandise cart in Serka Zong Bazaar

6/9/2008

Backstage
Install dishwasher and exhaust hood

MK
Install cameras at BTMRR
Install cameras in HoP
Install domestic solar powered hot water heaters in wardrobe building

SSR
New circuit for new show oven in Artist's Pallet

6/10/2008

AK
Install solar hot water heaters in forage building

Backstage
Install new dock door at DC3

Epcot
Refurb Quanset huts 2 and 3 behind living seas
Replace two chilled water AC units in Nine Dragons
Install network cable in Mexico costuming building

DTD

Install new gas boiler at Food Quest

Y&BC
Replace 4 doors and 29 windows

6/12/2008

AK

Install new ozone water treatment equipment
Install new ozone water treatment equipment

MK

Provide power, phone and data lines to new cash wrap counter in the Emporium

Boardwalk

Renovate 374 guest rooms

CBR

Renovate 1728 guest rooms

Four Seasons

Mass grading package

6/13/2008

DHS

Install automatic door opener in cast member services
Install automatic door opener in IP learning center
New cell tower

MK

Repair existing facade at Casey's Corner

Epcot

Demo wall and install new metal stud wall at Soarin
New cell tower

Water treatment facility
New cell tower

Contemporary

New roof mounted cell tower

6/18/2008

DHS

Install ice machines at OPS 3 building
Phase 2 of painting and caulking Animation office

Epcot

Replace ceiling tiles in Akershus kitchen

MK

Replace bitumen roof on SGE queue

6/19/2008

Boardwalk

Renovate 374 guest rooms

MK

Install new hopper, cyclone, compacter and filler in AV AC building
Install new tank a fueling system at Tomorrowland speedway
Install new topping bar at Pecos Bill's
Install 3 drink towers at Columbia Harbor house
Modify power distribution systems in Fantasyland substation
Install new rooftop AC unit on AV AC building
Fantasyland mechanical room/ power distribution modifications

Epcot

Replace dry storage with walk in cooler in UK
Replace wooden stairs with aluminum stairs backstage at American Adventure


Refurb kitchen and dinning room at Nine Dragons

AK

Replace carved animal motifs at Island Mercantile

CBR
Install new 208v outlet in deli

6/23/2008

Epcot

Electrical package for WDI trailer

6/24/2008

Install new emitters for audio description project. Locations include Phillarmagic, CBJ, The Land, TSM and LMA

Install sinage on Apopka Vineland rd

Install new electrical service for new ironer at laundry facility

Install new ironer at laundry facility

Ft Wilderness

Replace cabin doors

DHS
Construct metal framed screen at back of house gate for Mickey Ave widening


6/25/2008


DWWS

Operational graphics package.

6/26/2008

AK

Install new trench at dry bird quarantine

Monorail Shop

Modift 3 roll up doors

DC-3 Warehouse

Add modular office
 

Master Yoda

Pro Star Wars geek.
Premium Member
Original Poster
6/27/2008

MK Backstage

Install new pad for dumpster behind Splash Mountain

Boardwalk

Relocate power for Boardwalk Joe's coffee

DHS

Install power and control for lighted truss

Install power to security system on prop warehouse

Replace freezer at Hollywood and Vine

Contemporary

Install new footer for Christmas tree

Backstage at Vista Blvd warehouses

Install new lights

POP

Demo and install new package pickup next to everything POP merchandise shop.

Beach Club
Replaced damaged siding

7/1/2008

Install electrical equipment on roof of east and west inoventions building

DHS

REmove and refurb Muppet hot air balloon

7/3/2008

WL

Install ADA automatic door opener at Roaring Forks
Install new conduit and wire for new photo imaging

POFQ

Repair areas of rust on roof over commercial building lobby
Repare and replace ice shield on bridge between Old Man Island and Commercial building dock
Repir areas of rust on main window wall of commercial building

PORS

Flip existing bridge deck boards and replace stainless steel screws between Old Man island and main building

SSR

Provide plumbing hook up for glass wash machine
Provide plumbing hook up for glass wash machine
Provide plumbing hook up for glass wash machine
Provide plumbing hook up for glass wash machine
Provide plumbing hook up for glass wash machine

DHS

Install 10w voltage to monitor sprinkler riser at Narnia attraction

DTD

Install bug zapper at Goofy's candy company

Boardwalk

Harbour club child care office modifications

7/7/2008


DHS

Soundstage 4. no scope of work is given

7/8/2008


MK

Repair roof on IASW

Epcot

Replace hot water heat exchangers in Germany pavilion

DTD

REplace roof shingles on Earl of Sandwich

WL

Roof repairs

7/9/2008

DWWS

Install signs at Hess field #3
Construct rail around central globe icon
Supply permanent power to Hess gazebo

Contemporary

Update and refresh 4th floor restaurants

7/11/2008


DWWS

install 2 post car lift

Poly

install gutter a luau stage and drain at back of house

DHS

Upgrade all show lighting and install new dimmers on GMR

FAM building

Add new kitchen sink and faucet

TTC

Relocate wall and door

7/11/2008

Epcot

Relocate steel screen wall at Odyssey bridge

DHS

Install dimmer rack at Sounds Dangerous
Remove existing ticket booth window and replace with metal infill
Install new walls in men and womans bathrooms at Backlot trailer dressing room

MK

Fabricate and install new stainless steel railing on TTA
Install new wall in TL utilidoor

7/14/2008


Typhoon Lagoon

Install denitrification system in Shark Reef

7/15/2008

FW

Update HVAC in security kiosk

DQ

Install new air handler

GF

Prep and paint existing directional signs

DHS

Provide power hook ups for Osbourne lights
Add structural elements for Osbourne lights

Epcot

New fire sprinkler system in Norway

MK

New ice machine in Liberty Tree Tavern

7/17/2008

Epcot

Site work for trailer complex
New emitters for audio description project in Mexico and Soarin
Install integrated aquaculture system in the Land

AK

Erect wooden walkway at Kali
Steel replacement on Primeval whirl

DHS

Demo and install concrete, rock work, planters, irrigation, etc at Toluca turkey legs

CBR

New fence

7/18/2008

AK

Install 4 GFI circuits for fans and pumps in black rhino cage

7/21/2008


Epcot

IBM demo in inoventions west

MK

Replace wood shingles with synthetic shingles on Tinkerbell's Treasures and Sir Mickey's

FW

Install cable TV

Laundry Facility

Add 3 sprinkler heads to iron #8

7/22/2008


Epcot

Install new hardware on roof of inoventions east and west
Repair shade structure columns in inoventions

Vista Way

Repair roof on bldg #37

7/23/2008

Royal Plaza

Replace kitchen gas line

AK

install new fans in E:E queue

MK

New outlets and gondolas at Sir Mickey's

7/24/2008

MK

New fans in DVC kiosk
Buid new clock tower for city hall

AK

New fans in Discovery island boat dock

R&S building

New automatic door opener

DTD

Install new Dumbo at WoD
Create new warehouse office

Boardwalk

Atlantic dance hall light supports

7/25/2008


DC-2

Install new fans

CBR

Demo and replace tile at Old Port Royal shutters entrance
Remove and replace deck planks on Caribbean Beach Cay bridge

Epcot

Relocate fire alarm in Ital pavilion
Repair and replace gutter system on dome and aquatic structure in the land

Team Disney

Upgrade lighting controllers

7/30/2008

Epcot

Greek kiosk for F&W
aditional lights at Imagination post show
MK

Apply waterproof coating on Philharmagic queue

AK

Install VFD on Primeval Whirl

Disney University

Install fire doors

CBR

Pool sinage package

7/31/2008


DHS

Replace Air Handler on Sci-Fi Drive in
Replace Air Handler on ABC theater

WL

New ice machines

GF

New ice machines
New Ice Machines
New Ice Machines
New Ice Machines
New Ice Machines
Install Ice Machines

Vista Way

repair clubhouse roof

Pop

Sinage for new package pick up

Epcot

Refurb exterior of American Adventure

8/1/2008

NSA Bldg

Interior refurb

MK

Replace 13 CO2 sensors in utilidors

DHS

Mickey Avenue Mania facade
Remodel offices over animation building

DTD

Tempoary banner on DTD Xmas shop

8/5/2008

AK

Add console to south unload station

DC-2

New fans

PO

Replace restroom trellis

Sports Complex

Install drainage system for dugouts
New sprinkler system for HESS gazebo

Christmas Warehouse

Roll up door motor retrofit

8/7/2008

Contemporary

Marina restroom modification

GF

Refurb iron ornaments and second floor railings in lobby

MK

Replace counter tops and partitions in Tomorrow Land restrooms

8/11/2008

Laundry facility
New light pole

AK

Demo existing planter and redo hardscape at Flame Tree BBQ

DTD

Refurb WoD break room

Epcot (Backstage)

Provide new interior connection between Main building and Carlson's Ct

MK

Refurb BTMRR queue floor

8/12/2008

Epcot

IBM Think place marque
Remove existing ceramic tile and replace with MMA at Inoventions
Remove existing ceramic tile and replace with MMA at Inoventions
Replace cell deck portion of the evaporation cooling system at the land
Repair and recaulk all metal rib joints on World Showplace tent

WL

Refurb DVC villas

North Service Area

Repair motor cycle parking roof

DHS

New ductwork at scenic shop

AK

Replace sine at tree of life kids discovery club location
Various spot abatement for ride steel shoring attachment locations

Poly

Remove and replace emergency generator on building 11
Install safety shunt system on combo oven

GF

Install safety shunt system on combo oven
Replace unit 5 and install owner furnished York unit

FW

Relocate rental carts

8/14/2008

DHS

AI marque package
Replace refrigerator at Hollywood and Vine/50's prime time

MK

Modify boat maintenance facility at Splash Mountain
Install camera at toll plaza
Clean prep and repair Emporium canopy

Epcot

Update fire suppression system at Electric umbrella kitchen

Cirque

Relocate stairs

Casting building

Egress illumination

DHS

Remove and replace roof at West Block

Vista Way

Repair leaking roof.

Boardwalk

Refinish hard wood floors

Contemporary

Refurb restrooms at the marina
Replace deck boards at marina
Replace damaged sidewalks and curbs

8/15/2008

NSA Holiday services

Replace 2 automatic doors

NSA Textiles

Remove existing wall for new door

Team DisneyRelocate j-box for teleconferencing cables

Ride and show building

Modify existing walls

Boardwalk

Water hook up for Boardwalk Joe's

DHS

Interior refurb at sunset shops 7,8,9
AI terminations package
GMR super size billboard install

DTD

New slab and fence for Engineering building break room

Epcot

WS interactive kiosks and Odyssey bridge graphics
Cable install at Imagineering
Cable install at Imagineering
 

Master Yoda

Pro Star Wars geek.
Premium Member
Original Poster
8/18/2008

Epcot

Install fire relay in IBM exhibit at innoventions west
Odesey..Npermit is hand written and the scope of work in next to unreadable

8/20/2008

TTC

Install circuits for lighting at Ferry boat landing
Modify monorail station gates at both TTC and Epcot
Renovate break room at toll plaza

Epcot

Remove gray tile at inoventions

DTD

Install cameras at WoD

DHS

Install new Chevrolet blade sign

DC-3

Install security cameras

8/21/2008

AK

Primeval whirl facilities modification

Epcot

Minor repairs to Energy pavilion maintenance building

DTD

Replace concrete at PI bus stop

Disney University

Replace water coolers

CBR

Replace damaged gutters and down spouts

Vista Way

Replace tile roof with shingle roofs

CS

Room renovations

8/22/2008

AK

Replace counter at Tamu Tamu
Install power and LAN for podium at Tusker House
New foundation for thatch umbrella at Tusker house

DHS

Remove doors and install infill at office in Animation courtyard
Diamond shroud package at AI

BB

Modify support arm at runoff rapids

TL

Replace rotted wood at Leaning Palms

Warehouses behind SSR

Provide wire and conduit to existing CUTC

MK

Install 3 menu boards
Tinkerer bell treasures refurb
Minor repairs backstage in TomorrowLand


Central Shops

Power hook ups for new equipment
New fans and sprinklers in spray booth

8/25/2008

DHS

Narnia show banners

Epcot

Marquees for Australia exhibit at Germany pavilion

8/26/2008

Boardwalk

Replace 110 bollard lights along walkway

8/28/2008

Epcot

Replace mirrored roof tiles with new 3-ply biumen roof
Three new lights on Mexico Barn

DHS

Center street restrooms refurb
Install 3 duplex outlets over animation gallery artist desk
Baklot express plumbing repairs
Fiberoptic installation for Headened room relocation

Ops Dev Center

Install LAN and power for new projector

POFQ

New conduit and wiring for existing fixtures

GF

Replace damaged soil bin walls
Painting and stair repairs to building 8

AK

Tie down merchandise cart at E:E

MK

Modifications for Fairies queue
Install 8 ceiling fans over Cosmic Rays outdoor seating area.
Tinkerbells Treasures...no scope of work given

DC-2 Warehouse

Install security cameras

PI

Install new AC unit in PI live bar
New AC unit in lafers bar

DQ

New ice machine in kitchen

Contemporary

New HVAC units in convention center

Casting building

Renovations including ADA entry modification and new HVAC

SSR

Remodel office
Remodel office

AKL

New skimmer and rock work at Flamingo pool

AK

Carnatarus break room refurb

T-Rex

Network cable install

8/29/2008

Epcot

New vent hood at Nine Dragons
Interactive cart installation in Norway, Italy and international gateway

DHS

Pixar Facades

WL

Eight new bollard lights along walkway
New lights in silver creek cave.

River Country

Relocate power to new ice machine

4 seasons

No scope of work given but contractor is an electrical contractor

9/2/2008

MK

New foods building in Frontier land. Site plan points to area that has been walled off for some time between parade route and fry cart across from Peco's Bills
Audio upgraded to Main St train station

GF, WL, and Poly

Upgrades to boiler rooms

DHS

Refresh package to sound stage 1

9/4/2008

MK

Repave Daisy and Dopey lot
Replace light poles at entrance
Replace exterior lights on Castle

Epcot

Entrance statements for F&WF

DC-2 and DC-3 warehouse

Install fans

AK

Repaint Primeval Whirl

Ride and Show engineering building

Install access control system

9/5/2008

Epcot

MNorocco Gallery marquee packagePiping for new refrigerator rack at Nine Dragons

9/9/2008

Epcot

West elevation stucco repair and repaint of west elevation of Imagination pavilion

AK

Horticulture trailer AC duct modifications

DHS

Oscars stroller rental AC modifications
New roll up door at Rosie's

9/11/2008

AK

Install fish bins in hippo barns

Admin Area

New lights at softball field

AKL

Install water heaters at hand wash stations at Boma

Epcot

New signage for campus building at Red lot

MK

Install 8 new GAT terminal at Pecos Bills

HPB

New concrete foundations for parking gates at Hilton

9/12/2008

BB

Remove steel handrails and replace with stainless steel handrails
Repair damaged wood at Beach Haus
Repair damaged wood at Lottawatta Lodge

DHS

Furnish and install spray booth back stage
Install Pixar facades

MK

Landscape refurb at Tink's Treasures
New lighting at utilidors entrance

DTD

Add walls doors to BOH. Includes all electrical, paint mill work etc. Permit indicates Hane's shop...possible new store
New security building
New shed at DQ

North Service Area

Tie down shed

Epcot

Install pipe walls and doors at Body Wars
New tank lift at Living Seas
Replace electrical panel at SSE

Contemporary

Install power to 2 new cabanas

9/15/2008

Epcot

IBM showset package in inoventions
Tempoary wall at Fuel for Thought at TT

9/16/2008

MK

AV support at Tink's Treasures

Beach Club

Refurb concierge lounge

FW

Relocate fire suppression heads in Pioneer hall kitchen
Replace broken sewer line at Crockett's tavern

9/17/2008

Epcot

IBM thinkplace marquee for inoventions

AK

Reenforce steel grated floor. Location unknown.

Contemporary

@nd floor laundry room. No scope of work given. Contractor is an electrical contractor

DHS

Replace refrigeration bank at the Brown Derby

9/18/2008

Epcot

IBM facility package at inoventions
Install electrical and POS cabling for cold service station and podium at Norway

MK

HOP rigging package

AKL

Repaint elements of Royal and Governors suites
Remove and replace wood floor in Royal and Governors suites

Beach Club

Room refurb

PORS

Move condenser unit and minor electrical work and Commercial building
New sidewalk at commercial building

DHS

Install interior wall inside pizza planet
Ramp replacement at trailer #223

Poly

Replace glu-lam beam and hanger at monorail station

AK

Remove and replace rock work at mandrel exhibit

9/19/2008

DHS

Replace light fixtures at ToT

Epcot

Upgrade electrical on M:S foot cart

9/22/2008

DHS

Refurb golden age merchandise shop

Vista Way

Repair leaking roof

North service area

Install network cable at DC-4

9/23/2008

MK

Replace all the vines at Sir Mickey's

DHS

Plumbing repairs at Backlot Express
Instalation of 2 beverage islands at Backlot Express

9/24/2008

DHS

AI operations package

MK

Repair elevator lift at Tiki Room

9/25/2008

MK

Install power receptacles at multiple locations

CS

Refurb building 8B
Refurb building 8A
Refurb building 7B
Refurb building 7A
Refurb building 6B
Refurb building 5
Refurb building 2
Refurb building 1
Refurb building 9A
REfurb building 9B
Refurb building 3

9/26/2008

WDW Hilton

Provide electrical and data to new cashier both and gates

10/01/2008

PORS

Replace marina water tower

DTD

Build dimmer building for dock side stage
New fire sprinklers at Wetzles pretzels
New fire sprinklers at 43rd Thirst Street

10/02/2008

BB

Replace ski patrol roof

Centa Care

New lift station

WL

New heat lamps at WCC

Flying Fish

New stage light control

Fireworks warehouse

Install conduit from fireworks building to ware house

10/03/2008

DHS

Pixar billboard installation

Boardwalk

Replace spa heater
Extend laundry room awning

GF

Install hatch in porte cochere

BB

Replace rotten wood handrail at polar pub
Replace rock work on wave chamber

TL

Replace rock work and structural steel on Typhoon Tilly's

MK

Exterior refurb at CBJ
 

Master Yoda

Pro Star Wars geek.
Premium Member
Original Poster
10/07/2008

MK

Replace 3 drinking fountains at PotC
Replace the dome at Cosmic Ray's

Admin Area

Remove sewer and electrical from trailers

PORS

Replace 2 chilled water handlers at commercial building

Vista Way

Repair leaking roof
Repair leaking roof

AK

Repalce existing kitchen at Petrifries
Times up sign fabrication and installation for Primeval Whirl

10/08/2008

DHS

Relocation of electrical and cabling in existing and new animation building

10/09/2008

North Service Area

Install 3 ton chiller

Epcot

Clean and paint steel under rockwork in Canada

DHS

Delete handrails at LMA to improve wheelchair access
Repair gray walls at Pixar place

Admin Area

Demolish Trailers

MK

Install (3) 25' poles with 1000w spot lights backstage behind old 20k site
Replace 14 existing dock panels backstage behind old 20k site

10/14/2008

Vista Way

Replace tile roofing with shingles

North service area

Rework header over door at monorail building

10/15/2008

DHS

Maintenance bay lighting at TSM

DTD

Hanes design a T sign

10/16/2008

Boardwalk

Replace tiles at entry

GF

Upgrade 3 elevators
Install new hot water isolation valves in building 6 and 7

Poly

Install new sand filter and chemical injection system for pond at great ceremonial house

TL

Replace wave pool

CS

Reline hot water pipes at Cabana 9B

MK

Install new bridge railings at Tomorrow land speedway overpass

10/17/2008

MK

Main Street cabinet installation with shroud and footer
Replace curtain controller, animation breakout boxes and automatic door controller

Epcot

Remove existing wall and replace with metal stud wall at WoL Pavilion

DHS

Narnia meet and greet addition

10/23/2008

Epcot

Liberty mutual showset package.

DHS

Exterior refurb of Sid Cahuenga's

Vista Way

Repair roof

PORS

Resurface quite pool in Alligator Bayou

10/24/2008

DTD

Interior refurb of guest relations

PORS

HVAC upgrades in security kiosks

DHS

Playhouse Disney marquee package

10/27/2008

Balnk. Contractor is a heating and air contractor.

BB

Duct work at tube and towel rental.

Epcot

Liberty Mutual electrical package

MK

HoP refurb control package

10/28/2008

Epcot

Rewire lighting truss at Innoventions West

10/29/2008

DHS

Install 120v outlets on light poles for Christmas lights at Pixar place.

Epcot

Pour concrete footer. Fabricate wood shroud and all electrical at UK pavilion
Pour concrete footer. Fabricate wood shroud and all electrical at Future world
T Rowe Price improvements/ demo package at Innoventions West.

AK

Install stand alone cabinet at conversation station
Install stand alone cabinet at Pangani trail
Modify existing hot wire boxes with new configuration
Modify existing hot wire boxes with new configuration

DTD

Install 4 weather proof outlets at Cirque
Install 2 decorative signs

TL

Rockwork at Mayday falls

MK

Install temporary construction bridge at Tomorrowland bridge
Paint handrails at front of MK
Replace stairs to second level of TL skyway building

North Service area

Install carpet at DU
Install carpet at DU
Install protective netting for rail system at laundry facility

ASM

Replace pool heater

CBR

Resurface quiet pool add handrails and mount for ADA lift
Resurface quiet pool add handrails and mount for ADA lift

CS

Resurface quiet pool add handrails and mount for ADA lift

FW

Replace pool heater

PORS

Replace pool heater
Resurface quiet pool add handrails and mount for ADA lift
Resurface quiet pool add handrails and mount for ADA lift

10/30/2008

Epcot

Install wireless antenna for cell service in Germany pavilion
Install wireless antenna for cell service in Mexico pavilion
Install wireless antenna for cell service in Norway pavilion
Install wireless antenna for cell service in UK pavilion
Install wireless antenna for cell service in France pavilion

11/12/2008

Epcot

Replace roof on monorail rectifier building
Replace roof on monorail rectifier building

MK

Replace roof on monorail rectifier building
Expand fire suppression system in Plaza restaurant
Build shroud over control console for carousel

GF

Make duct and piping modifications to buildings 6 and 9

11/13/2008

Poly

Replace leaking exchanger in boiler

Epcot

Replace beauty caps and pressure plates on storefront windows
Install 5 new plasma TVs in character connection
Pressure wash and repaint rock work in Canada
Repaint exterior of Imagination building backstage
Install nw urethane caulking in concrete arond WS lagoon
Remove primer and paint from backstage stairs at the land.
Repaint stairs backstage at the land

MK

Install 1" conduit for Castle LAN

11/18/2008

Paml & Magnolia Golf Course

Bridge repairs

DHS

Replace 3 gas boilers
Replace roof on One Man's Dream building

BB

Replace heater on pump 1
Replace heater on pump 4

DTD

Repare shoreline at rear of RFC
Haines design a T marquee sign

All Star Resorts

Install new cart washer

WoL

Replace carpet with tile

11/19/2008

MK

Replace stage deck
New guard rails at JC

DHS

Bring parade audio room up to code
Install new automatic gates and switches at cast entrance

TS

New support steel above chlorine tanks

PORS

New automatic door and switches

Disney University

New automatic door and switches.

AK

New automatic door and switches at Program building
New automatic door and switches at cast services

Beach Club

Replace airline check in desk

11/20/2008

Contemporary

HVAC u[grades at guard shack

Boardwalk

Replace and relocate exhaust fan at big river grille

MK

Install shroud to cover vending machines at Ferry landing

CBR

Clean existing drains

11/24/2008

Epcot

Demo viking ship in Norway

AK

New food cart along the Majahara jungle trek

FW

New fueling station

11/25/2008

Epcot

Upgrades for UoE
New network cable at marina

Poly, WL, AKL

Upgrade HVAC in security kiosks

AK

Replace 2 chillers at Restaurantsaurus

South Service Area

Extened kennel

DTD

Repair/replace neon lighting at entryways
New lighting equipment at dock stage

Team Disney

New network cable

MK

New network cable at tunnel entrance

TL

Replace HVAC at Leaning Palms

Vista Way

Bathroom modifications
Bathroom modifications

12/02/2008

MK

Replace drywall and lighting at PotC gift shop

Contemporary

Add traffic cameras

PORS

Replace columns and roof at Ol Man River pool slide
New luggage cage and door

Epcot

Install self service drink fountain at Liberty Inn

DHS

Replace neon sign at tune in lounge

AK

Replace gorilla mesh at gorilla building

SS

Install ramp to fitness shed

OKW

Repair or replace HVAC in guest rooms

TTC

Repair roof

DTD

Reroof Art of Disney store
Design kiosks, pneumatic start box and lighting at Marketplace buildings 1 and 2

FW

Road work between entrances

World Drive

Mill road and repave

CBR

Guest room renovation

12/03/2008

OKW

New data cable
 

Master Yoda

Pro Star Wars geek.
Premium Member
Original Poster
12/4/2008

Boardwalk

Replace 4 windows on Atlantic Dance Hall.
Exterior refurb of resort and convention center.
New shingles for resort and convention center.

MK

Gut and redo existing restrooms at Mickey's Star Traders
New stucco finish entrance wall to Galaxy Theater
Addition to merchandise canopy at the Emporium

12/5/2008

MK

Remove existing UPS from EER and replace with new UPS at BTMRR

DHS

Replace existing rock work on tram overhang. (assuming catastrophe canyon)

TL

Replace existing pressure tanks and piping at Miss Tilly's

12/8/2008

Contemporary

Chef Mickey's and Outer Rim sign package

Epcot

Will call's sign package

12/9/2008

Pop Century

Upgrade electric for 2 new Kelvry warming tops
Replace existing warming tops in food court

AK

Roof replacement for creature comforts.

Poly

Remove housekeeping pick trailer.

Epcot

Roof replacement west gate complex

MK

Roof replacement Tom Sawyer Island raft launch
HVAC upgrades at Pecos Bill's

DHS

New Exterior lighting at ToT

12/11/2008

BB

New Marque Lottawatta Lounge

DHS

Install closed circuit TV switching system in Animation

MK

Counter and kitchen modifications at Pecos Bill's

12/12/2008

PORS

Replace wood columns, decorative metal and trusses at PORS

AK

Install new beam at giraffe barn for hoist.

MK

New cameras at Splash Mountain
New cameras at PotC
New cameras at HM
New cameras at dumbo
New cameras at BTMRR
New cameras at Columbia Harbor House
New cameras at Pinocchio Village Hause
New cameras at Pecos Bill's
New magical celebrations stage in Tomorrowland

Epcot

Replace beams and miscellaneous structural repairs at Canada pavilion

12/16/2008

North East Resort Parcel (4 Seasons)

Infastructure construction

FW

Pool upgrades

North Service area

New awnings on laundry building

GF

Exterior painting and stair repairs on building 7.

Epcot

Roof repairs at France pavilion

12/18/2008

North Service area

Internal construction of quality control building
Paint monorail building
Paint holiday service building

DTD

Complete Sun Trust building

GF

Elevator upgrades building 6
Elevator upgrades building 6

Vista Way

Replace roof of clubhouse

12/26/2008

Entrance to Hotel Plaza Blvd

What will you celebrate sign package

01/06/2009

Y&BC

Resurface pool
Add Verizon antenna to existing building

MK

Install emergency generators in Tommorowland
Install ice machine head at Pecos Bill's
Install conduit in utilidoors
Install new AEDs at multiple attractions
Replace roof on north rectifier building

GF

Resurface pool

CBR

Resurface Martinique pool

WL

Modify mechanical access doors in lobby

FT Wilderness

Construct expansion of 600 loop

DTD

Add Verizon antenna to Cirque building

CS

Add Verizon antenna to existing building

Epcot

Refurb Comucore fountain
Refurb column bases at gate in China
Refurbish pagoda building in Japan
Repair existing flat roofs in Japan

PORS

Replace dumpster pad

POFQ

Replace dumpster pad

AK

replace skylight in holding pen
Add fencing, gates and sunshade at holding pen
Install new AED's at several attractions

01/07/2009

MK

New stage in Tommorowland
New electrical panel
Provide conduit and wire for new IDS at Splash Mountain
Replace decking at Splash Mountain
New deck at Philarmagic

Epcot

Refurb kitchen of Electric Umbrella
Showset package for T Rowe Price exhibit

Boardwalk

Provide new electrical panel

CS

Reroute hood circuitry

Y&BC

Disconect hood circuitry

Contemporary

Disconnect hood circuitry in merchandise area
Remove section of railing and install new concrete at pool

AKL

Disconnect hood circuitry in Boma

TL

New kiddie slide

DHS

Replace chandlers in Sunset shops
Replace hot water tank at Sci-Fi
Replace piping at Catastrophe canyon

01/08/2009

Ft Wilderness

Set up 18 modular trailers (assuming new cabins for expansion)

North Service Area

New chiller and generator

Epcot

Refurb west restroom next to SSE
New AEDs at multiple attractions

Village lake

Replace sheet piles

MK

Replace carpet in Philarmagic

01/09/2008

Four Seasons

Golden Oak sign package
 

Master Yoda

Pro Star Wars geek.
Premium Member
Original Poster
What does "saved for future expansion" mean?
In the first permit thread it took only slightly less than 3 months before I ran out of room in the OP to continue 1 single continuous list. (there is a nonadjustable character limit to each post) In an effort to allow one single permit thread to continue for considerably longer than just a few months I secured the first 12 posts which by my estimation will allow a continuous list to last between 2 to 3 years. The "saved for future expansion" posts will in time be replaced with the chronological lists of permit filings.
 