WDW Permits

Master Yoda

Pro Star Wars geek.
Premium Member
Original Poster
Love them or hate them the construction permits are a great undeniable source of information of what is on the horizon for WDW. To make things a little easier on everyone here at WDWMagic I have decided to create one thread to cover the plethora of construction permits that WDW files on a daily basis. I will be searching the various pubic record sources and posting my findings on a daily basis. 2/21/2008

Epcot WS

Interactive utility package

Replacemet of vinyl fabric on backstage Queonset storage structure

MK

Fantasyland Circus Wagon

Instalation of cameras in Buzz queue

Instalation of cameras in JC queue

Adding a 20 amp receptacle to wardrobe

DHS

Installing cameras in ToT Queue

2/22/2008

DHS

$82,000 of new show set work. Also provide provide battens, power and brackets for new lighting. The address for this is listed as 200 Animation Dr DHS/Animation tour. If any one can give some insight as to which attraction this is and what is going on please chime in.

Replacing fence at Fantasmic food pad #2

Install fire alarm at Backlot theater

MK

Install speakers for BGM at BBB in the castle

Replacing steel beam and Liberty Square riverboat

Install new fence

AK

Install hot wire and charges

SSR

New electrical outlet at carriage house

2/26/2008

Epcot WS

WS interactive trailer package

DTD

Added air conditioning at Cirque Du Soleil

Vista Way

New Fence

2/27/2008

MK

New TL CoP poster

2/28/2008

MK

MCC and panel replacement

CBR

New wall and door in luggage room

3/03/2008

MK

Kodak logo update package

3/04/2008


AK

Locate and repair break in underground conduit
Replace wood railing with plastic railing at Dino Bites snacks


Install new metal platform at Primeval Whirl

SSR

Replacement of existing AM&CS system

Poly

Provide conduit for LAN and POS at photopass desk

DHS

Provide structural steel and plaster rock work. Address points to the Narnia attraction
Provide and install self climbing theatrical lighting trusses & curtains. Address points to old Hunch back stage

MK

Add new transformer and circuit breaker panel

DTD

Provide conduit for 2 existing monitors at Cirque

3/06/2008

OKW

Replace entry gate

Central Shops

Replace air handling units

Roof repair at holiday services building

DTD

Replace staircase and lighting at Captain Jack's

MK

Install cameras in Bull Lightyear queque

Install conduit and LAN lines backstage

CBR

Replace entry gate

3/8/2008

Epcot

Instal reverse osmosis system

3/11/2008

OKW

Repair sidewalks

Vista Way

Alter bathroom interiors on building 10

AK

Remove existing roll ups and replace with canvas ones on carnival games.

MK

Refurb cast member break room at Cosmic Ray's

3/13/2008

SSR

Install 4 new 20 amp circuits

DHS

Paint feature animation office

Boardwalk

Replace tile floor with epoxy floor at quiet pool trellis

Yacht Club

Replace quiet pool trellis

Boardwalk

Replace damaged siding on ESPN club

Epcot

Replace wooden stairs with aluminum stairs backstage at Germany pavilion

Replace wooden stairs with aluminum stairs backstage at France pavilion

Replace wooden stairs with aluminum stairs backstage at Morocco pavilion

Replace wooden stairs with aluminum stairs backstage at France pavilion

North Service Area

Add new canopies at fireworks dry storage area.

CBR

Security kiosk HVAC rehab

PORS

Replace feeder at south parking lot #95

3/17/08

DHS

Showset installation for Toy Story Mania

Finish floor walls and ceilings and install new lighting at Narnia attraction.

Epcot

Run power, phones, data and integrate with fire alarm system. Address indicates backstage to the right of Mexico pavilion

New slab for cart including all electrical. Address indicates UK pavilion

New slab for cart including all electrical. Address indicates behind the millennium pavilion

MK

New bus shelter near CM parking lot north of monorail house.

Deed for proposed fire station #3 adjacent to GF resort

AK

Install 3 new elephant gates in elephant barn

Install new beam and hoist in elephant barn

3/18/2008

DTD

Replace Disney Visa rewards kiosk

Repartition offices at guest relations to form 4 new offices

Poly

Install dimmer switch at Tambu lounge

AK

New hoist and I beam in white rhino building

MK

Replace 90' of asphalt road with concrete on bus only lane at toll plaza

Replace vinyl floor in Minnie's house in toontown

Replace wood floor at Minnie's house in toontown

Replace guard rails on tomorrowland speedway

Replace zone barriers on tomorowland speedway

Replace carpet at Cinderella's Royal Table

Replace condiment bar at Cosmic Ray's with new wunderbar

Replace condiment bar at Pecos Bill's with new Wunderbar

Rebuild and replace liberty square bridge.

DHS

Install fire alarm in new costume building

3/19/2008

Western Way Expansion

Grading package fro Flamingo Crossing

Northeast resort parcel site development

Epcot

Install new reverse osmosis system at Imagination Pavilion

3/20/2008

AKL

Exterior rehab and paint.

Poly

Fabricate parking lot, directional and DOT signs

CBR

Install network cable in the arcade

MK

Extend existing planter at Cosmic Ray's

Replace existing staircase at City Hall

All Star Resorts

Lift sidewalks at the All Star Resorts

Refurb pool laundry room at All Star Sports

3/21/2008

Bonnet creek golf course

Site development. Early works package

MK

Install new fire rated cabinet.

AK

Install new LAN, phone power and re circuit lights

install lights

Boardwalk

Quite pool. Install 2 new deck anchors for chair lift. Install dual hand rails at pool steps

3/21/2008

Bonnet creek golf course

Site development. Early works package

MK

Install new fire rated cabinet.

AK

Install new LAN, phone power and re circuit lights

install lights

Boardwalk

Quite pool. Install 2 new deck anchors for chair lift. Install dual hand rails at pool steps

3/24/2008

Epcot

Site prep for Storm Struck

Western Way

Amended grading package for Flamingo Crossing

Treehouse Villas

Rebuilding of treehouse villas

Contractor package for treehouse villas


3/25/2008

Epcot

Inoventions east wall rework

MK

Replace 160' of asphalt with concrete in bus only lane

Install bird deterrent at farmers market in Toon Town

Install security cameras in warehouse DC-6

Ft Wilderness

Replace existing cedar shake roof with synthetic shake roof on loop 1500 bus stop

Contemporary

Install 38' wall in convention center kitchen

3/26/2008

WDI

Refurb main building lobby

DHS

Mickey Ave graphics improvement package

3/27/2008

CB

Replace pipe columns

WWoS

Fire Cabinet install

MK

Pneumatic Airlines for Tomorrowland Speedway

Epcot

Innoventions WEST sign-up booth

Innoventions EAST sign-up booth

AK

Camp Minnie Mickey backstage trailer wiring (LAN and lights)

Visat Way

bathroom in building 11

DHS

LMA green room drainage repair

Property control

Install "hom strobes"

4/01/2008

AK

Restaurantosaurus - Install 12 Vulcan Fryers

Replace Mesh fence on the Pangiani Forest Trail

Epcot

Install network cable, Mexico pavilion

Team Disney

Replace shower pans in locker rooms

DHS

Install locker room signs at Oscar's

Ft Wilderness

Add a loading dock to Pioneer Hall

Install new data network

04/07/2008

DTD

Replace fabric awnings

Poly

Repair boiler

04/09/2008

DHS

Install vending machines at LMA

Disney university

Relocate door to accommodate new ADA ramp

4/10/2008

MK

Add new electrical outlets backstage

DHS

Replace section of fence around Echo Lake

Install Block Party Bash shade structure

GF

Clean, re-coat convention center floor

YC

Upgrade HVAC in security kiosk

BC

Upgrade HVAC in security kiosk

AK

Replace composite filters with steel filters on Kali

4/11/2008

DTD

New foundation for Disney Visa kiosk

DHS

New wall and door at theater of the stars (Fantasmic theater)

4/14/2008

Epcot

SPI site prep.

4/15/2008

Epcot

Replace drapes on Biergarten stage

Poly

Abate second floor storefront window at great ceremonial house

install glass in new storefront at great ceremonial house.

DHS
Install popsicle sticks graphics at sound stage 2&3

4/17/2008

DHS

American Idol Theater-Video display enclosure package

4/18/2008

Epcot

Remove Jr Chef sign at the Land

POFQ

Test kitchen install 3/4" water line with indirect waste line

Disney Village Dry dock
Prep for 12x24 shed

Bonnet Creek Osprey Ridge
Install new metal door and frame at pump house 8

DHS
Misc paint, finish work, concrete for turnstiles, soffit for door opener. Address would suggest this is for Toy Story Mania

Epcot
Install foundation and wall for "Wind Chime" gag under stairs at Mitsukoshi Restaurant.

4/22/2008

AK

Install automatic doors at Pride rock cafeteria

Ft Wilderness

Replace light poles in parking lot

Add 58 new lights along sidewalk from Pargo parking lot to Big Pine Dr

Epcot

Strom Struck facility package

New merchandise kiosk at China pavilion

New food kiosk for F&WF in China

New cooler freezer in China pavilion

MK

New wood canopy on engineering services building

Intstall back-flow preventers

Replace water wheel at Tom Sawyer's island

Install fans in Speedway queue

Remove "Indy" graphics at Speedway and replace with Tommorowland graphics

Refresh show kitchen at confectionery

DHS

Remove condiment bar at Backlot express

Replace kitchen at Catalina Eddie's

AKL
Relocate hose bib

All Stars

Replace ice machines

4/23/2008

DHS

Narnia sign package
 

Kamikaze

Well-Known Member
One suggestion: I know you don't want to editorialize, but a good thing to do would be to give a brief description of what you think each thing actually is. For example 'Interactive Utility Package' doesn't mean a lot to most people.
 

Master Yoda

Pro Star Wars geek.
Premium Member
Original Poster
One suggestion: I know you don't want to editorialize, but a good thing to do would be to give a brief description of what you think each thing actually is. For example 'Interactive Utility Package' doesn't mean a lot to most people.
In situation where I can at least reasonably explain what is going on I will. Unfortunately in that particular example "Interactive utility package" doesn't mean much to me either. I suspect it is for either the NDS interactive map or for the Kim Possible game that Disney is/was testing but it just as well might be for Pal Mickey or something entirely different. The point is I do not want to guess and misinform someone. I am trying to be very Joe Friday in this thread..."Just the facts".

Hopefully this thread will help to shed light on some of the more interesting permits as the official descriptions of the scope of work are often quite vague.
 

lpet11984

Well-Known Member
Hopefully this thread will help to shed light on some of the more interesting permits as the official descriptions of the scope of work are often quite vague.

Awesome-- I hope so too. Knowing about all the permits is great, but having the thread to talk about them is better. Keep up the good work, Joe. :king:
 

brkgnews

Well-Known Member
Demolition-The title says it all.

One quick note... "demolition," as a construction term, does not always mean "oh noes, theyre tearing down teh EPCOT Centar!!!!111elevenone"
:lol:

"Demolition" can be something as simple as tearing down a single wall in an area. You need more info before you can presume it's all wrecking balls and front-end loaders.

Doesn't apply to anything already posted... just noting for future instances.
:wave:
 

Master Yoda

Pro Star Wars geek.
Premium Member
Original Poster
One quick note... "demolition," as a construction term, does not always mean "oh noes, theyre tearing down teh EPCOT Centar!!!!111elevenone"
:lol:

"Demolition" can be something as simple as tearing down a single wall in an area. You need more info before you can presume it's all wrecking balls and front-end loaders.

Doesn't apply to anything already posted... just noting for future instances.
:wave:
I intend on doing just that. Providing of course a scope of work is spelled out in the permit.

The same thing holds true with the word "failure" in engineering. Most people have an image of that I-35W bridge collapse in Mississippi when they hear the word failure. In the engineering world failure means "deflecting past code limits" 99% of the time.
 

New2WDW

New Member
Excellent idea Master Yoda, but did you obtain a permit to list permits, permittable by the permit department therein....:lol:
 

Master Yoda

Pro Star Wars geek.
Premium Member
Original Poster
Did anyone notice that the deck is being replaced with "Trex decking" ... lol. Dunno if that's a play on words or not

(Note ... it's not haha - http://www.trex.com)
Trex is a partially synthetic decking material. It requires no sanding or staining, it will not rot or splinter. It is considerably more expensive than wood but it will last almost indefinitely and still look brand new.

.......and I just noticed the link in your post.:hammer:

Excellent idea Master Yoda, but did you obtain a permit to list permits, permittable by the permit department therein....:lol:
Actually I did....from a certain point of view.:lookaroun
 

WDW Monorail

Well-Known Member
Good idea Yoda. I do check the site each day for something interesting. Yesterday, the only one filed happened to be interesting!

I'm still sticking with the KP game for the utility package. After all, the NDS system has yet to be fully implemented in the MK... unless they don't like the idea of having portable GPS systems in 1920s Missouri and would rather have it in EPCOT. :lookaroun

As a side note, isn't it interesting that most permits on the site are for resorts, backstage areas, water parks, and EPCOT? Maybe once or twice a week do I see permits for any of the other parks.
 