News everyone. Management is on it's way to changing Everest so It can run Five trains. To do this, they have to lengthen the ride from 3 minutes to about 4 minutes. So if this goes through, the chain lift up will be much slower, and you'll have to wait around awhile at Shadow of the Yeti for the Train ahead of you to pull into unload. What's wrong with this is that the system wasn't made for this. If anyone takes a little longer getting off the train at unload (Which happens ALOT.) The ride will cascade. (For those of you who don't know ride systems, that means the trains will back up. So each train stops at a brake zone.) The reason behind this is so that they can give more Fastpasses. (Which is stupid because if the ride's stopped those few Fastpasses don't mean anything.) The ride will still be safe, It just won't work very good. Plus, If one train needs to go down, you'll have four trains running a slower ride, which means that you can't get as many people through in an hour.
:hammer:
Thought everyone would be interested in this item of news. Let's just hope they themselves see that this is a VERY bad idea.
:hammer:
Thought everyone would be interested in this item of news. Let's just hope they themselves see that this is a VERY bad idea.