Rather than continue to de-rail the Little Mermaid e-ticket thread, let's move all discussion on The Fastpass debate to this thread. I've gone through the thread and pulled out all the Fastpass related content I could find:
Post 449
Post 452
Post 460
Post 522
Post 523
Post 525
Post 526
Post 527
Post 528 (Quoting Captain Michael in 525)
Post 529
Post 530
Post 538 (Quoting DisneyParksFan1 in 527, and RSoxNo1 in 528)
Post 539
Post 541
Post 542 (Quoting Figment632 in 538)
Post 543
Post 544
Post 545
Post 546
Post 547
Post 548
Post 549
Post 550 (Quoting Figment632 in 548 and Next Big Thing in 549)
Post 551
Post 449
I know this was dismissed earlier, but I'm willing to bet that this ride will have a fastpass for at least the first few years.
Post 452
Ugh...It's Omni...Why!?
Post 460
It has nothing to do with the type of ride system, it has to do with hourly capacity vs. demand. Omni movers have a lower capacity than Kilimanjaro Safaris, yet the Safaris has a fastpass.
I would think that at least when the initial demand starts off, it may be necessary for them to implement fastpass.
Post 522
I wonder if Mermaid will start off with FPs or not...that too will ruin the experience.
Post 523
Why would FP ruin the experience?
Post 525
Because Omnimovers don't need it. FP only creates unnecessary lines for Omnimover attractions. See: Haunted Mansion
One could argue that all of Fantasyland would benefit from a landwide FP banishment.
Post 526
Thank you! FP does nothing but hurt omnimover attractions Buzz SRS would never have a line over 35-40 minutes with out FP.
Post 527
I agree. Even though the lines are long, especially at WDW, FP makes them worse and it kind of tries to defy what the concept of a queue, well a Disney queue, is. A well themed, intricate, and an immersive waiting area full of back-story before you enter the actual attraction.
Post 528 (Quoting Captain Michael in 525)
How do you not understand this? The ride system does not matter, it's total capacity per hour. If the demand for the attraction exceeds that capacity it creates a line.
The demand for Haunted Mansion is larger than the demand for The Seas with Nemo and Friends. For that reason I would argue that Haunted Mansion could utilized Fastpass while it would not be as necessary on The Seas with Nemo and Friends.
Rides like Kilimanjaro Safaris and Kali River Rapids have a larger capacity than any omnimovers, yet they utilize Fastpass because often times their demand necessitates it.
Post 529
But there's a difference. Omnimovers are continuously loading. Their lines would never get longer than 30 minutes if there was no fastpass.
Omnimovers should not have fastpass. Period.
But they aren't continuously loading. Their lines stop and start, meaning that no matter what there's going to be back ups that omni rides wouldn't have.
Also, Safaris shouldn't have fastpass, just as Jungle Cruise shouldn't.
Post 530
Wrong. First off, Haunted Mansion loads in groups into the Stretch Room, but we'll ignore that.
Omnimovers don't get long lines because they have a large capacity, not because they are continuously loading.
If an attraction dispatches 2 guests every 2 seconds (For the sake of this argument we'll call this attraction an omnimover), that attraction has a capacity of 1800 guests per hour. If 0 people are in line for that attraction at the beginning of the hour, and 2700 people line up for that attraction at consistent intervals (say 2 guests every 1.5 seconds), then that attraction will have a wait of 1/2 an hour at the end of that hour. 1800 people will have been on the ride, and 900 more will be waiting in line.
If another attraction dispatches 24 guests every 30 seconds (For the sake of this argument we'll call this attraction Kilimanjaro Safaris), that attraction has a capacity of 2880 guests per hour. If 0 people are in line for that attraction at the beginning of the hour, and 2700 people line up for that attraction at consistent intervals (say 2 guests every 1.5 seconds), then that attraction won't have a wait at the end of the hour. All 2700 people will have been on the ride, and conceivably an additional 180 guests could have gotten on the ride without more than a 30 second wait).
See above. Fastpass lengthens standby lines - there's no question there, but if used correctly it helps guests see more attractions per day. The reason why this is true, is because not everyone can (or is willing to) use it at maximum efficiency.
If you're arguing that Jungle Cruise, Safaris, and any Omnimover shouldn't have Fastpass, what should have Fastpass? If your argument is that it should be removed entirely than it's a different argument altogether.
Post 538 (Quoting DisneyParksFan1 in 527, and RSoxNo1 in 528)
It works fine except on Omnimovers.
How do you not get it! Lets take SSE which is constantly moving on a very busy day. If they have FP then they stop the standard line for lets say 2 minutes to let FP through. People don't stop getting on line so the line backs up for those 2 minutes. Lets now say that people abuse FP and show up late. The FP line is getting long so they stop the standard line fo 6 minutes this time.
It is a pattern everytime you stop the normaly constantly moving line for FP the wait will be longer.
Post 539
Get a fastpass and stop moaning like a girl. FFS.
Post 541
I also support the "get a fastpass and stop moaning" comment.
Post 542 (Quoting Figment632 in 538)
I think you're assuming that the guests using Fast Passes would (in a world without FPs) not just be in the normal line, and I think that's a wrong assumption. Rides move people per hour, period. If you took the people in the fast pass line, and moved them into the regular line (like it was before fastpasses) the overall wait time is the same.
All the system has done is given a group of guests, who would have been ahead of you anyway, the chance to go and do other things instead of waiting in line the entire time. Whether or not that's a good thing overall is debatable, but it certainly doesn't make overall wait times longer.
Post 543
The thing you are not getting is that the line is costantly moving it doesn't stop unless the number of guets is over whelming. On New Years Eve the line for SSE filled all of the queue on both sides and wrapped around almost to innoventions. The wait was posted at 1 hour, in reality it was 25 minutes.
And don't get me wrong I love FP just not on omnimovers.
Post 544
How does a load rate that is continuous vs. stop/start, when riders/hour is equivalent, affect the wait time?
Or, are you saying the omnimovers don't have wait times long enough to justify a Fast Pass system? If that's the case, what does it matter whether the ride has it or not?
If you're claiming it somehow increases the wait time on Omnimovers, try to use math in your explanation. It's easier to understand.
Post 545
Well since we don't have any data that would be a hard thing to do.
Logic dictates that when you stop something that is moving there is a delay. Logically if they stop the normal line to let FP people through the normal line will be longer. If it is not moving and more people are getting on line there is an increase in the wait.
It like the NJ turnpike when there is an accident and you can't move for 25 minutes, you will be 25 minutes behind schedule.
Post 546
So you don't like that the CM has to spend .5 seconds per fastpass group to turn and allow them onto the ride? Remember that the people in the fastpass line would just be in the normal line if there wasn't a fastpass, and it would still take them the same amount of time to walk onto the ride.
Post 547
I've tried not to talk down to you, and I'll try to do that in this post as well. If this comes off as condescending, I apologize in advance.
In your Spaceship Earth example, let's assume that Spaceship Earth loads 4 people every 5.76 seconds for a total capacity per hour of 2500. The capacity of the attraction is determined by the speed in which it loads, and from a business operations standpoint, we will refer to this as the bottleneck of the operation. If the attraction was not an omnimover, but could load 20 people every 15 seconds, it would have a much larger capacity (4800) and would be ok to use Fastpass in your mind because it isn't an omnimover.
If there is a cast member that is collecting Fastpasses for the attraction, they will not be collecting those fastpasses right at the load area, but rather at a Fastpass merge point. The wait after this merge point will typically be long enough so that there is a continuous flow of guests coming from the merge point. This will create a buffer of say 20-30 guests between the merge point and the loading area. The cast member that is receiving the fastpasses can then move through guests at the same pace that the cast member in charge of loading is loading guests (4 guests for ever 5.76 seconds). If this results in the standby line waiting 2 minutes, it would mean that during those two minutes, that means the Fastpass Cast member let in 80 fastpass guests to 0 Standby guests (which is entirely possible). The same type of thing would happen in another attraction that was not an Omnimover had the same capacity.
Thank you
The posted wait time has no bearing on your argument whatsoever. If a ride's capacity is 2500, and there are 2500 people in line in front of you, you will wait an hour.
In that same situation if you get in the standby line, and there are 2000 people in the standby line, and 0 people in the fastpass line, but 500 people get in the fastpass line before you reach the merge point, than you will also wait an hour.
Once again the ride system is irrelevent.
To continue the argument further. The omnimover is actually one of the best type of ride system for using fastpass, provided the demand for the attraction necessitates it, because it facilitates a larger capacity of guests per hour and the dispatch interval is relatively small. The argument against the use of Fastpass makes sense when discussing shows. Continuous running shows like PhilharMagic or It's Tough to be a Bug shouldn't use fastpass in it's current form because the show interval (essentially the dispatch interval) can be something like 20 minutes as opposed to 5.76 seconds.
Fastpass lengthens the standby line - that's relatively straight forward. However, the proper utilization of fastpass (for rides) is contingent on capacity per hour. The reason why the distinction (for rides) is necessary is because rides typically have dispatch intervals of less than 1 minute. This means that the variability of the wait for two attractions that have the same hourly capacity but different dispatch intervals should be less than a minute given the same amount of people in line.
This means that if attraction A can dispatch 2 people every 3 seconds, it will have a capacity of 2400 people per hour.
If attract B can dispatch 40 people every 60 seconds, it will also have a capacity of 2400 people per hour.
If you are guest #2401 in line for Attraction A, your wait will be 1 hour, and 3 seconds. If you are guest #2401 in line for Attraction B, your wait will be 1 hour, and 1 minute.
That is the only difference.
Post 548
I don't know what you are talking about you have never talked down to me sorry if I gave you that impression. You are not like most people on this site, you can have a logical debate without insulting people :wave:
Post 549
omg, I am not even a part of this argument and you are driving me crazy acting like you are a know it all on the fast pass system. All you are doing is coming off annoying for repeatedly saying the same thing over and over and pretty stupid throwing around all these numbers that no one cares to read.
Post 550 (Quoting Figment632 in 548 and Next Big Thing in 549)
Good, I'm glad we can continue this as a civil conversation.
Then again, maybe we can't continue this as a civil conversation.
OK, I don't know who are you, but as you said, you weren't part of this argument, nor did you contribute anything of value to the discussion. I agree that I'm repeating myself, except as I'm repeating myself I'm trying to clarify my point in this discussion.
As to whether or not I'm a know it all on the fast pass system - feel free to think what you want.
Post 551
You're the one coming off annoying here.
Capacity and average rides per day all pertain to the "Fast Pass debate"...